SP

Solar Power Supply

Tesla Certified solar installer in Riverside with over 1,000 completed projects

Riverside, California
4.7 (25 reviews)
Verified
Residential Commercial

11+

Years in Business

1,000+

Projects Completed

25

Customer Reviews

37 mi

Service Area

1-10

Employees

SurgePV Score

7.5 / 10
Customer Reviews
94%
Certifications
60%
Experience
85%
Services Range
60%
Warranty Coverage
63%
Online Presence
75%

About Solar Power Supply

Solar Power Supply is a Tesla Certified solar installation company located at 3770 Pierce St, Suite 105, Riverside, CA 92503. Founded in 2015, the company has completed over 1,000 residential and commercial solar installations across Riverside and the surrounding Inland Empire communities.

The company installs solar panel systems using products from leading manufacturers including Solaria, REC, and IronRidge, paired with Enphase microinverters and Tesla Powerwall battery storage. Solar Power Supply also handles nonprofit and governmental solar projects, demonstrating versatility across different customer segments and project types.

Solar Power Supply provides comprehensive installation packages that include system design, permitting, installation, and utility interconnection. The company offers installation packages that combine microinverters, black PV modules, railing systems, and decorative skirts for a clean aesthetic appearance on residential rooftops.

Service Area

Solar Power Supply serves the following areas within a 37-mile radius:

RiversideCoronaMoreno ValleyNorco

Are you Solar Power Supply?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage

Certifications & Accreditations

Tesla Certified Installer

Partner Manufacturers

Panels

SolariaREC

Inverters

Enphase

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

25 reviews

Edward S.

18 September 2025
Verified Customer

Solar Power Supply installed a great system with Enphase microinverters. Their knowledge of the Riverside area and local utility requirements made the process smooth.

Cindy L.

5 July 2025
Verified Customer

As a Tesla Certified Installer, they paired our solar panels with a Powerwall seamlessly. The crew was professional and the system has been excellent.

Raymond H.

20 April 2025
Verified Customer

Good experience with Solar Power Supply. Competitive pricing and quality equipment. The installation was completed on the day they promised.

Frequently Asked Questions About Solar Power Supply

What services does Solar Power Supply offer?

Solar Power Supply offers Solar Installation, Battery Storage.

Is Solar Power Supply NABCEP certified?

Solar Power Supply holds the following certifications: Tesla Certified Installer. Contact them directly for the latest accreditation details.

What areas does Solar Power Supply serve?

Solar Power Supply serves Riverside, Corona, Moreno Valley, Norco. They are based in Riverside with a service radius of 60 km.

What warranty does Solar Power Supply offer?

Solar Power Supply offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Solar Power Supply's customer reviews?

Solar Power Supply has a 4.7/5 rating based on 25 customer reviews. Customers consistently rate them highly.

How long has Solar Power Supply been in business?

Solar Power Supply was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Solar Power Supply

Fill in your details and we'll connect you with Solar Power Supply.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote