Solar PV Colchester
Colchester's only dual MCS-certified solar PV and battery storage installer
2026+
Years in Business
50 km
Service Area
1-10
Employees
SurgePV Score
About Solar PV Colchester
Solar PV Colchester is the trading name of Watt & Connolly Contracts Ltd, a solar PV design and installation company that has operated from Colchester for over ten years. The company holds the distinction of being the only contractor in Colchester with MCS accreditation for both Solar PV and Battery Storage installations — a dual certification that ensures the highest installation standards for both technologies.
Watt & Connolly specialise in bespoke solar array design and battery backup systems for residential homes, commercial properties, and large-scale solar farm projects. Their experience spans a wide range of system sizes and property types, allowing the team to design solutions that match individual energy requirements and site conditions.
Solar PV Colchester is contactable by phone on 01206 912808 or by email at [email protected]. Customers can also submit an enquiry through the company’s website at solarpvcolchester.com. Their focus on dual MCS certification for both solar and battery installations gives customers confidence that both elements of a combined system are installed to the same certified standard.
Service Area
Solar PV Colchester serves the following areas within a 50 km radius:
Contact Information
Are you Solar PV Colchester?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
No reviews yet.
Frequently Asked Questions About Solar PV Colchester
What services does Solar PV Colchester offer?
Solar PV Colchester offers Solar Installation, Battery Storage, Maintenance.
Is Solar PV Colchester MCS certified?
Yes, Solar PV Colchester is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Solar PV Colchester serve?
Solar PV Colchester serves Colchester, Chelmsford, Ipswich, Braintree. They are based in Colchester with a service radius of 50 km.
What warranty does Solar PV Colchester offer?
Solar PV Colchester offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Solar PV Colchester's customer reviews?
Solar PV Colchester does not have any reviews yet. Be the first to leave a review after using their services.
How long has Solar PV Colchester been in business?
Solar PV Colchester was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Colchester
Get a Free Solar Quote from Solar PV Colchester
Fill in your details and we'll connect you with Solar PV Colchester.
Quote request sent!
Solar PV Colchester will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile