SolarGuru Energy
SunPower dealer providing solar, battery, and roofing installations in San Francisco since 2020
6+
Years in Business
48
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About SolarGuru Energy
SolarGuru Energy is a solar installation company with a San Francisco office at 2210 Cecilia Ave in the Parkside neighborhood, as well as locations in Oakland, Berkeley, and San Diego. Founded in September 2020, the company has grown rapidly and is BBB-accredited with an A+ rating. SolarGuru is a SunPower dealer and provides solar panel installation, battery storage, and roofing services for residential and commercial customers.
The company installs panels from SunPower, REC, Qcells, and Aptos, alongside Enphase microinverters and battery storage from Tesla Powerwall, Enphase, FranklinWH, and Generac. SolarGuru also offers Tesla Solar Roofs and GAF solar roofing systems. The company analyzes each customer’s energy bill and roof configuration to design optimized systems, with the actual panel installation typically completed in two to three days.
On Birdeye, SunPower by SolarGuru Energy holds a 4.8-star rating with 48 reviews. Customers praise the company’s responsiveness and the range of equipment options available. SolarGuru Energy can be reached at (833) 383-4878 or by email at [email protected].
Service Area
SolarGuru Energy serves the following areas within a 50-mile radius:
Contact Information
Are you SolarGuru Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
48 reviews
Raj P.
SolarGuru handled our SunPower installation from start to finish. Great communication and the system is performing above the projections.
Emma T.
We appreciated the multiple financing options and the transparent pricing. The installation crew was professional and efficient.
Greg S.
Good overall experience. The system design process was thorough and the installation quality was solid. Would recommend.
Frequently Asked Questions About SolarGuru Energy
What services does SolarGuru Energy offer?
SolarGuru Energy offers Solar Installation, Battery Storage, roofing.
Is SolarGuru Energy NABCEP certified?
SolarGuru Energy holds the following certifications: BBB Accredited, CSLB Licensed, SunPower Dealer. Contact them directly for the latest accreditation details.
What areas does SolarGuru Energy serve?
SolarGuru Energy serves San Francisco, Oakland, Berkeley, San Jose, San Diego. They are based in San Francisco with a service radius of 80 km.
What warranty does SolarGuru Energy offer?
SolarGuru Energy offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are SolarGuru Energy's customer reviews?
SolarGuru Energy has a 4.8/5 rating based on 48 customer reviews. Customers consistently rate them highly.
How long has SolarGuru Energy been in business?
SolarGuru Energy was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.
Similar Installers in San Francisco
Get a Free Solar Quote from SolarGuru Energy
Fill in your details and we'll connect you with SolarGuru Energy.
Quote request sent!
SolarGuru Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile