SolarMax Technology
Riverside-headquartered solar and LED company, NASDAQ-listed since 2008
18+
Years in Business
360
Customer Reviews
62 mi
Service Area
51-200
Employees
SurgePV Score
About SolarMax Technology
SolarMax Technology is a renewable energy company founded in 2008 and headquartered at 3080 12th St, Riverside, CA 92507. Co-founded by David Hsu, Ching Liu, and Simon Yuan, the company has grown from a local solar installer into a NASDAQ-listed national EPC (Engineering, Procurement, and Construction) provider specializing in residential solar systems, commercial LED lighting, and energy storage solutions.
SolarMax operates offices in Riverside, Temecula, San Diego, and Diamond Bar, providing coverage across Southern California. The company handles residential and commercial solar panel installations along with battery storage systems and LED lighting upgrades. With over 15 years in the industry, SolarMax has established itself as one of the largest solar companies headquartered in the Inland Empire.
The company operates Monday through Thursday from 8 AM to 7 PM and Friday from 8 AM to 6 PM. SolarMax Technology maintains a presence on the Yelp platform with over 360 reviews and continues to serve the Riverside County market as one of the region’s longest-operating solar installers.
Service Area
SolarMax Technology serves the following areas within a 62-mile radius:
Contact Information
Are you SolarMax Technology?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
3.9
360 reviews
Victor H.
SolarMax designed and installed a system that has been producing above expectations. The sales team was transparent about costs and the installation crew was professional.
Diana C.
Good installation experience and competitive pricing. The system has been running smoothly. Communication could have been better during the permitting phase.
George P.
The installation itself was well done, but post-installation support could be improved. Response times for service requests were slower than expected.
Frequently Asked Questions About SolarMax Technology
What services does SolarMax Technology offer?
SolarMax Technology offers Solar Installation, Battery Storage, Monitoring.
Is SolarMax Technology NABCEP certified?
SolarMax Technology holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does SolarMax Technology serve?
SolarMax Technology serves Riverside, Temecula, San Diego, Diamond Bar, Corona. They are based in Riverside with a service radius of 100 km.
What warranty does SolarMax Technology offer?
SolarMax Technology offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are SolarMax Technology's customer reviews?
SolarMax Technology has a 3.9/5 rating based on 360 customer reviews. See individual reviews on this page for more detail.
How long has SolarMax Technology been in business?
SolarMax Technology was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.
Similar Installers in Riverside
Get a Free Solar Quote from SolarMax Technology
Fill in your details and we'll connect you with SolarMax Technology.
Quote request sent!
SolarMax Technology will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile