Solux Power
Local Oklahoma City solar installer offering affordable residential and commercial solar solutions
2026+
Years in Business
10
Customer Reviews
50 mi
Service Area
2-10
Employees
SurgePV Score
About Solux Power
Solux Power is a locally owned solar installation company located at 3609 S Council Road, Oklahoma City, OK 73179. The company specializes in affordable residential and commercial solar panel installation throughout the Oklahoma City metro area.
Solux Power provides up-front pricing with no hidden fees and offers free quotes for homeowners and businesses interested in solar energy. The company handles the complete installation process from system design through permitting and utility interconnection. Customers have praised the company for clear communication about expected energy production and annual savings.
The company serves Oklahoma City and surrounding communities including Moore, Norman, Yukon, Mustang, and Midwest City. Solux Power positions itself as a locally operated alternative to national solar chains, offering personalized service and competitive pricing for Oklahoma homeowners looking to reduce their energy costs.
Service Area
Solux Power serves the following areas within a 50-mile radius:
Contact Information
Are you Solux Power?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.6
10 reviews
Verified Customer
Solux Power provided great communication and a quality install. Very happy with how the system is performing and the savings on our energy bills.
Verified Customer
An Oklahoma company that explained how much power our system would generate and how much we would save annually. The numbers have been accurate so far.
Verified Customer
Good experience with Solux Power for our home solar installation. The pricing was transparent and the installation was completed on schedule.
Frequently Asked Questions About Solux Power
What services does Solux Power offer?
Solux Power offers Solar Installation.
Is Solux Power NABCEP certified?
Solux Power holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Solux Power serve?
Solux Power serves Oklahoma City, Moore, Norman, Yukon, Mustang, Midwest City. They are based in Oklahoma City with a service radius of 80 km.
What warranty does Solux Power offer?
Solux Power offers 25-year panel warranty, and 10-year installation/workmanship warranty.
How are Solux Power's customer reviews?
Solux Power has a 4.6/5 rating based on 10 customer reviews. Customers consistently rate them highly.
How long has Solux Power been in business?
Solux Power was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Oklahoma City
Get a Free Solar Quote from Solux Power
Fill in your details and we'll connect you with Solux Power.
Quote request sent!
Solux Power will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile