SE

Southern Energy Management

North Carolina's original local solar company with 24+ years of experience and an in-house team of 180+ professionals

Raleigh, North Carolina
4.8 (120 reviews)
Verified
Residential Commercial

25+

Years in Business

1,500+

Projects Completed

120

Customer Reviews

124 mi

Service Area

51-200

Employees

SurgePV Score

9.7 / 10
Customer Reviews
96%
Certifications
100%
Experience
100%
Services Range
100%
Warranty Coverage
80%
Online Presence
100%

About Southern Energy Management

Southern Energy Management (SEM) is North Carolina’s original local solar company, headquartered at 5908 Triangle Drive, Raleigh, NC 27617. Founded in 2001 by Bob and Maria Kingery, SEM is a family-owned Certified B Corporation with an in-house team of over 180 solar and building performance professionals. The company has helped more than 1,500 homeowners go solar and has installed over 15 megawatts of solar power across the Carolinas and Mid-Atlantic region.

SEM employs NABCEP-certified PV installers and NABCEP-certified technical sales staff. The company is Raleigh’s top certified Tesla Powerwall installer, having installed over 950 batteries across North Carolina. SEM installs panels from Q Cells, REC, and Canadian Solar alongside Enphase and SolarEdge inverters. Beyond solar, the company provides comprehensive building performance services including energy audits, HERS ratings, and ENERGY STAR home verification, having helped verify more than 19,000 ENERGY STAR and green-certified homes.

SEM holds an A+ BBB rating, a 4.9-star rating on Houzz, and a 4.8-star average on Angi. The company has earned recognition as a mission-driven business that prioritizes environmental impact alongside quality installations. Business hours are Monday through Friday, 8:00 AM to 5:00 PM. SEM provides a 25-year panel and inverter warranty alongside a 10-year workmanship warranty on all installations.

Service Area

Southern Energy Management serves the following areas within a 124-mile radius:

RaleighDurhamChapel HillCaryGreensboroWilmingtonFayettevilleCharlotte

Are you Southern Energy Management?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Energy Audit
Solar Design
Monitoring
Commercial Solar

Certifications & Accreditations

NABCEP Certified PV Installer NABCEP Certified Technical Sales B Corp Certified Tesla Powerwall Certified ENERGY STAR Partner BBB A+ Rating

Partner Manufacturers

Panels

Q CellsRECCanadian Solar

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

120 reviews

Catherine H.

15 October 2025
Verified Customer

SEM installed a 12 kW system with Tesla Powerwall on our Raleigh home. The process was smooth from the initial energy audit through final activation. Their team answered every question thoroughly and never rushed us.

William D.

8 June 2025
Verified Customer

As a B Corp they walk the walk on sustainability. The installation crew was punctual and professional, and the system has been producing exactly as projected. We chose them specifically because they are locally owned and mission-driven.

Janet P.

20 January 2025
Verified Customer

Good company with knowledgeable staff. The site assessment was thorough and the design made good use of our limited south-facing roof space. Minor communication delays during the permit phase but everything worked out well.

Frequently Asked Questions About Southern Energy Management

What services does Southern Energy Management offer?

Southern Energy Management offers Solar Installation, Battery Storage, Energy Audit, Solar Design, Monitoring, Commercial Solar.

Is Southern Energy Management NABCEP certified?

Southern Energy Management holds the following certifications: NABCEP Certified PV Installer, NABCEP Certified Technical Sales, B Corp Certified, Tesla Powerwall Certified, ENERGY STAR Partner, BBB A+ Rating. Contact them directly for the latest accreditation details.

What areas does Southern Energy Management serve?

Southern Energy Management serves Raleigh, Durham, Chapel Hill, Cary, Greensboro, Wilmington, Fayetteville, Charlotte. They are based in Raleigh with a service radius of 200 km.

What warranty does Southern Energy Management offer?

Southern Energy Management offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Southern Energy Management's customer reviews?

Southern Energy Management has a 4.8/5 rating based on 120 customer reviews. Customers consistently rate them highly.

How long has Southern Energy Management been in business?

Southern Energy Management was founded in 2001 and has been in business for 25 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Southern Energy Management

Fill in your details and we'll connect you with Southern Energy Management.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote