SS

Steiner's Solar

Sacramento's veteran solar installer designing custom residential solar electric and pool heating systems since 1981

Sacramento, California
4.6 (44 reviews)
Verified
Residential

45+

Years in Business

0

44

Customer Reviews

50 mi

Service Area

2-10

Employees

SurgePV Score

7.9 / 10
Customer Reviews
92%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
80%
Online Presence
50%

About Steiner's Solar

Steiner’s Solar is a solar installation company established in 1981 and located at 9900 Firstone Drive in Sacramento, California. The company is one of the longest-operating solar businesses in the Sacramento region, with over four decades of experience designing and installing custom residential solar electric systems and solar pool heating systems. Steiner’s Solar is currently operated by owner Steve Sharp.

The company specializes in designing solar energy systems specifically tailored to Sacramento’s climate and each home’s unique roof configuration and energy usage. Steiner’s Solar handles residential solar electric installations as well as solar pool heating, offering homeowners a single provider for multiple solar applications. The owner is directly involved in system design and customer consultations.

Steiner’s Solar holds a California CSLB license (No. 887507) and maintains a 4.6-star average rating from 44 customer reviews. The company is known for its hands-on, owner-operated approach where customers work directly with the principal designer. Steiner’s Solar offers manufacturer warranties on all equipment plus workmanship guarantees on installations. The office is open Monday through Friday from 8 AM to 5 PM.

Service Area

Steiner's Solar serves the following areas within a 50-mile radius:

SacramentoElk GroveRancho CordovaFair OaksCarmichaelCitrus Heights

Are you Steiner's Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Maintenance
Solar Design

Certifications & Accreditations

CSLB Licensed

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.6

44 reviews

Frank D.

15 September 2025
Verified Customer

Steiner's Solar has been around since 1981 and the experience shows. Steve Sharp personally designed our system and the installation was top-notch. Our electricity bill has dropped to almost nothing.

Dorothy S.

22 May 2025
Verified Customer

We used Steiner's for both solar electric and solar pool heating. They clearly know the Sacramento climate and designed systems that perform perfectly. Great old-school service with personal attention.

Richard H.

18 January 2025
Verified Customer

Reliable company with decades of experience. The system is working well and the price was fair. The owner is hands-on and answers questions directly. Would recommend for anyone wanting a local, established company.

Frequently Asked Questions About Steiner's Solar

What services does Steiner's Solar offer?

Steiner's Solar offers Solar Installation, Maintenance, Solar Design.

Is Steiner's Solar NABCEP certified?

Steiner's Solar holds the following certifications: CSLB Licensed. Contact them directly for the latest accreditation details.

What areas does Steiner's Solar serve?

Steiner's Solar serves Sacramento, Elk Grove, Rancho Cordova, Fair Oaks, Carmichael, Citrus Heights. They are based in Sacramento with a service radius of 80 km.

What warranty does Steiner's Solar offer?

Steiner's Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Steiner's Solar's customer reviews?

Steiner's Solar has a 4.6/5 rating based on 44 customer reviews. Customers consistently rate them highly.

How long has Steiner's Solar been in business?

Steiner's Solar was founded in 1981 and has been in business for 45 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Steiner's Solar

Fill in your details and we'll connect you with Steiner's Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote