Sun Peak Solar Services
Locally owned Bakersfield solar installer serving residential, commercial, and industrial clients since 2013
13+
Years in Business
20
Customer Reviews
62 mi
Service Area
2-10
Employees
SurgePV Score
About Sun Peak Solar Services
Sun Peak Solar Services is a locally owned solar installation company located at 2001 Westwind Dr #9, Bakersfield, CA 93301. Founded by Frank Gelinas on December 16, 2013, the company has been serving Kern County residents and businesses with solar energy solutions for over a decade.
Sun Peak Solar installs the latest microinverter technology to ensure systems deliver optimal performance. The company serves residential, commercial, and industrial customers throughout Kern County and holds a BBB A+ rating and California State License Board licensing.
As a locally owned and operated installer, Sun Peak Solar provides personalized service and free solar assessments, helping Bakersfield area property owners understand the costs and benefits of going solar under current California energy policies.
Service Area
Sun Peak Solar Services serves the following areas within a 62-mile radius:
Contact Information
Are you Sun Peak Solar Services?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Inverters
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
20 reviews
Verified Customer
Sun Peak Solar designed a system perfectly suited to our Bakersfield home. Frank and the team were honest and transparent throughout the entire process.
Verified Customer
Great local company. Sun Peak handled our commercial solar project from design to installation with no issues. The microinverter system is performing well.
Verified Customer
Highly recommend Sun Peak Solar. Locally owned, fair pricing, and they stand behind their work with a 25-year warranty.
Frequently Asked Questions About Sun Peak Solar Services
What services does Sun Peak Solar Services offer?
Sun Peak Solar Services offers Solar Installation, Battery Storage, Maintenance.
Is Sun Peak Solar Services NABCEP certified?
Sun Peak Solar Services holds the following certifications: BBB A+ Rating, CSLB Licensed. Contact them directly for the latest accreditation details.
What areas does Sun Peak Solar Services serve?
Sun Peak Solar Services serves Bakersfield, Delano, Shafter, Wasco, Tehachapi, Ridgecrest. They are based in Bakersfield with a service radius of 100 km.
What warranty does Sun Peak Solar Services offer?
Sun Peak Solar Services offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Sun Peak Solar Services's customer reviews?
Sun Peak Solar Services has a 4.8/5 rating based on 20 customer reviews. Customers consistently rate them highly.
How long has Sun Peak Solar Services been in business?
Sun Peak Solar Services was founded in 2013 and has been in business for 13 years. They are one of the more experienced solar installers in their area.
Similar Installers in Bakersfield
Get a Free Solar Quote from Sun Peak Solar Services
Fill in your details and we'll connect you with Sun Peak Solar Services.
Quote request sent!
Sun Peak Solar Services will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile