Sun Solar
SunPower Residential Top Producer of the Year serving Bakersfield homeowners and businesses
2026+
Years in Business
92
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About Sun Solar
Sun Solar is a Bakersfield-based solar installation company located at 12625 Jomani Dr, Ste 101, Bakersfield, CA 93312. The company was named SunPower’s Residential Top Producer of the Year consecutively from 2014 to 2020, establishing it as one of the highest-volume SunPower dealers in the region.
Sun Solar installs SunPower and Maxeon solar panels with Enphase microinverters, serving both residential and commercial customers in the Bakersfield area and throughout Kern County. The company handles all aspects of the installation process, including system design, permitting, installation, and ongoing monitoring.
Open Monday through Friday from 8:00 AM to 6:30 PM and Saturday from 8:00 AM to 5:00 PM, Sun Solar provides free solar consultations and system assessments for homeowners and businesses in the greater Bakersfield area.
Service Area
Sun Solar serves the following areas within a 62-mile radius:
Contact Information
Are you Sun Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
92 reviews
Verified Customer
Sun Solar installed a SunPower system on our home and it has been performing above expectations. The team was professional and handled everything from start to finish.
Verified Customer
Chose Sun Solar because they were SunPower's Top Producer for years. The installation quality and customer service reflect that recognition.
Verified Customer
Good experience with Sun Solar. The system design was well thought out and the installation was completed in two days.
Frequently Asked Questions About Sun Solar
What services does Sun Solar offer?
Sun Solar offers Solar Installation, Battery Storage, Maintenance, Monitoring.
Is Sun Solar NABCEP certified?
Sun Solar holds the following certifications: SunPower Master Dealer. Contact them directly for the latest accreditation details.
What areas does Sun Solar serve?
Sun Solar serves Bakersfield, Delano, Shafter, Wasco, Tehachapi, Ridgecrest. They are based in Bakersfield with a service radius of 100 km.
What warranty does Sun Solar offer?
Sun Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Sun Solar's customer reviews?
Sun Solar has a 4.7/5 rating based on 92 customer reviews. Customers consistently rate them highly.
How long has Sun Solar been in business?
Sun Solar was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Bakersfield
Get a Free Solar Quote from Sun Solar
Fill in your details and we'll connect you with Sun Solar.
Quote request sent!
Sun Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile