SS

Sunergy Systems

Employee-owned solar design and installation company serving the Puget Sound since 2005

Seattle, Washington
4.9 (44 reviews)
Verified
Residential Commercial

21+

Years in Business

3,000+

Projects Completed

44

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

8.6 / 10
Customer Reviews
98%
Certifications
75%
Experience
100%
Services Range
75%
Warranty Coverage
80%
Online Presence
75%

About Sunergy Systems

Sunergy Systems is an employee-owned solar company headquartered at 4546 Leary Way NW in Seattle. Founded in 2005, it is one of the most experienced solar design and installation firms in the Puget Sound region, having completed over 3,000 residential and commercial solar installations totaling more than 15 megawatts of clean energy capacity.

The company specializes in custom solar PV system design and battery storage integration. Sunergy is a REC Certified Installer and Tesla Powerwall Certified Installer, pairing high-efficiency REC panels with Enphase microinverters and Tesla battery solutions. The team handles every stage of a project in-house, from initial site assessment and engineering through permitting and final commissioning.

Sunergy Systems holds an A+ rating with the BBB and maintains a 4.9-star rating across review platforms. Customers consistently highlight the company’s thorough communication, clean workmanship, and the accountability that comes with its employee-owned structure. Office hours are Monday through Friday, 8:00 AM to 5:00 PM.

Service Area

Sunergy Systems serves the following areas within a 50-mile radius:

SeattleBellevueKirklandRedmondShoreline

Are you Sunergy Systems?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
system_design

Certifications & Accreditations

REC Certified Installer Tesla Powerwall Certified

Partner Manufacturers

Panels

REC

Inverters

Enphase

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

44 reviews

Seattle Homeowner

10 November 2025
Verified Customer

Highly personable and professional customer service. The installation team was thorough and respectful of our property throughout the entire process.

Puget Sound Customer

22 August 2025
Verified Customer

Employee-owned and it shows. Everyone we dealt with genuinely cared about quality. System has been performing above projections since day one.

Ballard Resident

15 June 2025
Verified Customer

From initial assessment through final inspection, Sunergy was communicative and professional. High quality installation and panels running smoothly.

Frequently Asked Questions About Sunergy Systems

What services does Sunergy Systems offer?

Sunergy Systems offers Solar Installation, Battery Storage, system_design.

Is Sunergy Systems NABCEP certified?

Sunergy Systems holds the following certifications: REC Certified Installer, Tesla Powerwall Certified. Contact them directly for the latest accreditation details.

What areas does Sunergy Systems serve?

Sunergy Systems serves Seattle, Bellevue, Kirkland, Redmond, Shoreline. They are based in Seattle with a service radius of 80 km.

What warranty does Sunergy Systems offer?

Sunergy Systems offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Sunergy Systems's customer reviews?

Sunergy Systems has a 4.9/5 rating based on 44 customer reviews. Customers consistently rate them highly.

How long has Sunergy Systems been in business?

Sunergy Systems was founded in 2005 and has been in business for 21 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Sunergy Systems

Fill in your details and we'll connect you with Sunergy Systems.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote