Sunlight Solar
San Diego residential solar installer based in El Cajon offering solar, battery, and roofing services
11+
Years in Business
127
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About Sunlight Solar
Sunlight Solar is a residential solar installation company based at 1300 N Johnson Ave, Suite 104 in El Cajon, San Diego County. The company provides solar panel installation, battery storage, and roofing services for homeowners across San Diego and Southern California. Sunlight Solar handles every aspect of the solar process, from initial consultation and system design through permitting, installation, and utility interconnection.
The company is CSLB licensed and employs in-house installation crews. Sunlight Solar has built a strong reputation in the San Diego market through word-of-mouth referrals and positive customer reviews. The company can be reached by phone at (858) 564-8032 for general inquiries or (858) 375-9597 for appointments, and by email at [email protected] or [email protected].
On Yelp, Sunlight Solar holds a 4.8-star rating from 127 reviews. Customers describe the company as upfront and honest, with consistent praise for the quality of installations and responsive post-installation support. The company serves communities throughout San Diego County including El Cajon, La Mesa, Chula Vista, Santee, and central San Diego.
Service Area
Sunlight Solar serves the following areas within a 50-mile radius:
Contact Information
Are you Sunlight Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
127 reviews
Kevin B.
Sunlight Solar did an excellent job on our installation. They were upfront about costs and timelines, and delivered on every promise.
Lisa M.
Great experience from start to finish. The team was professional and the system is producing exactly what they estimated. Very satisfied.
Dave H.
Solid company with honest people. The installation was clean and efficient. Our electricity bills have dropped dramatically.
Frequently Asked Questions About Sunlight Solar
What services does Sunlight Solar offer?
Sunlight Solar offers Solar Installation, Battery Storage, roofing, Maintenance.
Is Sunlight Solar NABCEP certified?
Sunlight Solar holds the following certifications: CSLB Licensed. Contact them directly for the latest accreditation details.
What areas does Sunlight Solar serve?
Sunlight Solar serves San Diego, El Cajon, La Mesa, Chula Vista, Santee, Lakeside, Spring Valley. They are based in San Diego with a service radius of 80 km.
What warranty does Sunlight Solar offer?
Sunlight Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Sunlight Solar's customer reviews?
Sunlight Solar has a 4.8/5 rating based on 127 customer reviews. Customers consistently rate them highly.
How long has Sunlight Solar been in business?
Sunlight Solar was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.
Similar Installers in San Diego
Get a Free Solar Quote from Sunlight Solar
Fill in your details and we'll connect you with Sunlight Solar.
Quote request sent!
Sunlight Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile