Sunlux
Southern California solar company with licensed Professional Engineers and Master Electricians
11+
Years in Business
50
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About Sunlux
Sunlux is a solar installation company headquartered in Chino, California, with a Riverside County office at 2410 Wardlow Road, Suite 103, Corona, CA 92880. Founded in 2015, the company serves customers across Southern California with residential and commercial solar panel systems, battery storage, and solar maintenance services.
The company employs licensed Professional Engineers, Master Electricians, and dedicated service technicians, providing engineering-level expertise for system design and installation. Sunlux also operates in Texas, giving the company a multi-state presence. The company offers solar panel repairs and maintenance in addition to new installations.
Sunlux handles all aspects of solar projects from initial consultation and engineering design through permitting, installation, and ongoing maintenance. The company focuses on delivering high-quality installations backed by professional engineering oversight and experienced field crews across the Riverside, Corona, and broader Inland Empire markets.
Service Area
Sunlux serves the following areas within a 50-mile radius:
Contact Information
Are you Sunlux?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
50 reviews
Peter H.
Sunlux provided a very professional experience. Their engineers designed an optimal system for our roof and the installation was completed in a single day.
Michelle S.
The team at Sunlux was knowledgeable and thorough. They explained every aspect of the system and handled all the permitting. Our energy production has been excellent.
Alan R.
Good solar company with experienced staff. They also offer repair and maintenance services which gives peace of mind knowing they will be there for the long term.
Frequently Asked Questions About Sunlux
What services does Sunlux offer?
Sunlux offers Solar Installation, Battery Storage, Maintenance.
Is Sunlux NABCEP certified?
Sunlux holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Sunlux serve?
Sunlux serves Riverside, Corona, Chino, Ontario, Rancho Cucamonga. They are based in Riverside with a service radius of 80 km.
What warranty does Sunlux offer?
Sunlux offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Sunlux's customer reviews?
Sunlux has a 4.5/5 rating based on 50 customer reviews. Customers consistently rate them highly.
How long has Sunlux been in business?
Sunlux was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.
Similar Installers in Riverside
Get a Free Solar Quote from Sunlux
Fill in your details and we'll connect you with Sunlux.
Quote request sent!
Sunlux will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile