SS

SunRock Solar

Cincinnati-based solar installer specializing in residential and commercial systems since 2006

Cincinnati, Ohio
4.8 (10 reviews)
Residential Commercial

20+

Years in Business

0

10

Customer Reviews

62 mi

Service Area

1-10

Employees

SurgePV Score

6.8 / 10
Customer Reviews
96%
Certifications
0%
Experience
100%
Services Range
75%
Warranty Coverage
80%
Online Presence
50%

About SunRock Solar

SunRock Solar is a solar energy installation company located at 11311 Foremark Drive, Cincinnati, OH 45241. Founded in 2006 by Carl Adams, SunRock Solar has been serving the Cincinnati and Dayton areas with residential and commercial solar power systems for nearly two decades.

The company provides complete solar energy solutions including system design, equipment procurement, installation, and ongoing maintenance. SunRock Solar works with both homeowners and businesses to design custom solar systems tailored to specific energy needs and roof configurations.

SunRock Solar serves the Greater Cincinnati and Dayton metropolitan areas with a focus on delivering quality installations at competitive prices.

Service Area

SunRock Solar serves the following areas within a 62-mile radius:

CincinnatiDaytonBlue AshMasonWest Chester

Are you SunRock Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
system_design
Maintenance

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

10 reviews

Verified Customer

18 July 2025
Verified Customer

SunRock Solar gave us a great price and great service. The team was very knowledgeable and accessible throughout the entire installation process.

Verified Customer

22 April 2025
Verified Customer

Professional solar installation at a competitive price. SunRock has been in the business for nearly 20 years and it shows in their quality of work.

Verified Customer

15 January 2025
Verified Customer

Excellent experience with SunRock Solar. They designed a system that fit our budget and energy needs perfectly. The installation was completed quickly.

Frequently Asked Questions About SunRock Solar

What services does SunRock Solar offer?

SunRock Solar offers Solar Installation, system_design, Maintenance.

Is SunRock Solar NABCEP certified?

SunRock Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does SunRock Solar serve?

SunRock Solar serves Cincinnati, Dayton, Blue Ash, Mason, West Chester. They are based in Cincinnati with a service radius of 100 km.

What warranty does SunRock Solar offer?

SunRock Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are SunRock Solar's customer reviews?

SunRock Solar has a 4.8/5 rating based on 10 customer reviews. Customers consistently rate them highly.

How long has SunRock Solar been in business?

SunRock Solar was founded in 2006 and has been in business for 20 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from SunRock Solar

Fill in your details and we'll connect you with SunRock Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote