SS

SunVest Solar

Wisconsin-based solar developer ranked among the nation's top 50 solar contractors since 2009

Milwaukee, Wisconsin
4.3 (30 reviews)
Verified
Residential Commercial

17+

Years in Business

1,000+

Projects Completed

30

Customer Reviews

93 mi

Service Area

11-50

Employees

SurgePV Score

8.6 / 10
Customer Reviews
86%
Certifications
90%
Experience
100%
Services Range
90%
Warranty Coverage
80%
Online Presence
50%

About SunVest Solar

SunVest Solar is a vertically integrated solar development platform headquartered in Pewaukee, Wisconsin, just west of Milwaukee in Waukesha County. Founded in 2009 by Mark and Matt Neumann, the company provides solar development, construction, financing, and operations services for residential and commercial clients. SunVest Solar is consistently ranked among the top 50 solar developers in the United States by Solar Power World Magazine.

The company operates across the full solar value chain, including marketing, sales, design, financing, installation, and ongoing system operations. SunVest is not limited to any single equipment manufacturer or financing method, which allows them to recommend the optimal combination of technology and financing for each project. Their experience with commercial and utility-scale projects gives them engineering depth that benefits residential customers as well.

SunVest Solar holds BBB accreditation and is a Focus on Energy Trade Ally in Wisconsin. The company maintains offices in Pewaukee and Chicago, and serves clients throughout Wisconsin and the broader Midwest. Their headquarters at N27 W24025 Paul Court in Pewaukee is conveniently located for Milwaukee-area consultations, and they serve communities across Milwaukee, Waukesha, Racine, and Kenosha counties.

Service Area

SunVest Solar serves the following areas within a 93-mile radius:

MilwaukeePewaukeeWaukeshaWest AllisWauwatosaMadisonBrookfieldNew BerlinRacineKenosha

Are you SunVest Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design
Commercial Solar
Monitoring
financing

Certifications & Accreditations

BBB Accredited Solar Power World Top 50 Focus on Energy Trade Ally

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.3

30 reviews

Robert H.

10 July 2025
Verified Customer

SunVest handled our commercial solar project from development through installation. Their ability to arrange financing and handle all permitting made the process straightforward for our business. The system is generating significant savings on our electricity costs.

Carol J.

20 February 2025
Verified Customer

We went with SunVest for our home solar installation. The design and installation quality were good, and the pricing was competitive. Communication could have been slightly more proactive during the permitting phase, but overall a positive experience.

Steven F.

15 September 2024
Verified Customer

SunVest developed a solar system for our small business in Waukesha County. Their experience with commercial projects was evident. The system is producing as projected and our ROI timeline looks solid.

Frequently Asked Questions About SunVest Solar

What services does SunVest Solar offer?

SunVest Solar offers Solar Installation, Solar Design, Commercial Solar, Monitoring, financing.

Is SunVest Solar NABCEP certified?

SunVest Solar holds the following certifications: BBB Accredited, Solar Power World Top 50, Focus on Energy Trade Ally. Contact them directly for the latest accreditation details.

What areas does SunVest Solar serve?

SunVest Solar serves Milwaukee, Pewaukee, Waukesha, West Allis, Wauwatosa, Madison, Brookfield, New Berlin and 2 other areas. They are based in Milwaukee with a service radius of 150 km.

What warranty does SunVest Solar offer?

SunVest Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are SunVest Solar's customer reviews?

SunVest Solar has a 4.3/5 rating based on 30 customer reviews. They are well-regarded by their customers.

How long has SunVest Solar been in business?

SunVest Solar was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from SunVest Solar

Fill in your details and we'll connect you with SunVest Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote