Supreme Power
BBB A+ rated solar maintenance and installation company serving residential and commercial customers in the New Orleans metro
14+
Years in Business
25
Customer Reviews
62 mi
Service Area
2-10
Employees
SurgePV Score
About Supreme Power
Supreme Power is a solar maintenance and installation company based in Metairie, Louisiana at One Galleria Boulevard, Suite 1900. Founded in 2012, the company specializes in maintaining solar system integrity and maximizing energy efficiency for residential and commercial customers. Supreme Power holds a BBB A+ rating and is BBB Accredited, reflecting the company’s commitment to customer service standards.
The company provides comprehensive solar services including panel cleaning, system monitoring, troubleshooting and repair, removals and reinstalls, energy audits, solar hot water system servicing, and new system design and installation. Supreme Power serves both residential low-to-moderate income customers and commercial solar companies across the greater New Orleans metropolitan area.
Supreme Power is led by owner Michael King, who personally oversees service quality and customer relationships. The company maintains extended business hours, operating Monday through Saturday from 8am to 8pm and Sunday from 8am to 1pm. Supreme Power also offers an alternative contact number at 225-442-3160 and can be reached via [email protected] for business inquiries.
Service Area
Supreme Power serves the following areas within a 62-mile radius:
Contact Information
Are you Supreme Power?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
5 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.6
25 reviews
Verified Customer
Supreme Power maintains our solar system and the service is always prompt and professional. Owner Michael King personally oversees the maintenance visits and ensures everything is running at peak efficiency.
Verified Customer
We hired Supreme Power for a full system inspection and cleaning. They identified a panel issue that was reducing our production and had it resolved quickly. The difference in output was immediately noticeable.
Verified Customer
Reliable solar maintenance company with good customer service. They handle our quarterly cleaning and annual inspection. The energy audit they performed helped us identify additional savings beyond solar.
Frequently Asked Questions About Supreme Power
What services does Supreme Power offer?
Supreme Power offers Solar Installation, Maintenance, Monitoring, Energy Audit.
Is Supreme Power NABCEP certified?
Supreme Power holds the following certifications: BBB A+ Rating. Contact them directly for the latest accreditation details.
What areas does Supreme Power serve?
Supreme Power serves New Orleans, Metairie, Kenner, Gretna, Harvey, Slidell, Covington. They are based in New Orleans with a service radius of 100 km.
What warranty does Supreme Power offer?
Supreme Power offers 5-year installation/workmanship warranty.
How are Supreme Power's customer reviews?
Supreme Power has a 4.6/5 rating based on 25 customer reviews. Customers consistently rate them highly.
How long has Supreme Power been in business?
Supreme Power was founded in 2012 and has been in business for 14 years. They are one of the more experienced solar installers in their area.
Similar Installers in New Orleans
Get a Free Solar Quote from Supreme Power
Fill in your details and we'll connect you with Supreme Power.
Quote request sent!
Supreme Power will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile