SE

Switch Electric Home Energy

Top-rated electrical and solar contractor serving the Seattle metro and Walla Walla since 2009

Seattle, Washington
4.9 (201 reviews)
Residential

17+

Years in Business

0

201

Customer Reviews

62 mi

Service Area

11-50

Employees

SurgePV Score

7.4 / 10
Customer Reviews
98%
Certifications
0%
Experience
100%
Services Range
90%
Warranty Coverage
80%
Online Presence
75%

About Switch Electric Home Energy

Switch Electric Home Energy is an electrical and solar contractor headquartered at 16778 146th St SE, Suite 154 in Monroe, Washington, serving the greater Seattle metro area and Walla Walla. Founded in 2009, the company provides residential solar panel installation, battery storage, EV charging stations, standby generator installation, and general electrical services.

The company employs a team of licensed electricians who handle all solar and electrical work in-house. Switch Electric focuses on the residential market, offering complete solar system design and installation along with complementary electrical upgrades like panel replacements and EV charger installations. The company’s broad service area covers Snohomish, King, and Walla Walla counties.

Switch Electric Home Energy maintains a 4.9-star rating with over 200 reviews on Yelp, making it one of the most-reviewed solar installers in the greater Seattle area. Customers consistently highlight the team’s communication, professionalism, and personable approach. The company offers free consultations and can be reached by phone or through their online scheduling system.

Service Area

Switch Electric Home Energy serves the following areas within a 62-mile radius:

SeattleMonroeEverettBellevueWalla Walla

Are you Switch Electric Home Energy?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
electrical_services
generator_installation

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

201 reviews

Monroe Homeowner

15 November 2025
Verified Customer

Switch Electric handled our solar panel system from design to installation. Every interaction was fantastic, easy to get ahold of, professional and personable.

Seattle Customer

3 August 2025
Verified Customer

Great communication throughout the entire project. The team was punctual, knowledgeable, and left our property cleaner than they found it.

Eastside Resident

19 May 2025
Verified Customer

Designed and installed a solar panel system for our home. Professional, communicative, and the quality of work was excellent.

Frequently Asked Questions About Switch Electric Home Energy

What services does Switch Electric Home Energy offer?

Switch Electric Home Energy offers Solar Installation, Battery Storage, EV Charging, electrical_services, generator_installation.

Is Switch Electric Home Energy NABCEP certified?

Switch Electric Home Energy holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Switch Electric Home Energy serve?

Switch Electric Home Energy serves Seattle, Monroe, Everett, Bellevue, Walla Walla. They are based in Seattle with a service radius of 100 km.

What warranty does Switch Electric Home Energy offer?

Switch Electric Home Energy offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Switch Electric Home Energy's customer reviews?

Switch Electric Home Energy has a 4.9/5 rating based on 201 customer reviews. Customers consistently rate them highly.

How long has Switch Electric Home Energy been in business?

Switch Electric Home Energy was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Switch Electric Home Energy

Fill in your details and we'll connect you with Switch Electric Home Energy.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote