TB

Tampa Bay Solar

Veteran-owned solar company founded by a former Navy SEAL, serving Tampa Bay since 2011

Tampa, Florida
4.8 (230 reviews)
Verified
Residential Commercial

15+

Years in Business

2,000+

Projects Completed

230

Customer Reviews

62 mi

Service Area

11-50

Employees

SurgePV Score

7.8 / 10
Customer Reviews
96%
Certifications
60%
Experience
85%
Services Range
75%
Warranty Coverage
63%
Online Presence
75%

About Tampa Bay Solar

Tampa Bay Solar is a veteran-owned and operated solar installation company headquartered at 6002 East Adamo Drive in Tampa, Florida. Founded in 2011 by Steve Rutherford, a retired Navy SEAL Commander with a Master of Science in Applied Physics, the company brings military-grade precision and integrity to every solar project. Rutherford led energy system development for special operations and directed national energy policy research before bringing his mission home to help Floridians gain energy independence.

The company has completed over 2,000 installations across Central Florida, with all systems designed for hurricane zones and high heat conditions. Tampa Bay Solar uses in-house crews, many of whom are veterans, to handle every project from consultation to installation with no outsourcing. The company’s solar panels and hot water systems are certified by the Florida Solar Energy Center (FSEC), and it holds Florida license CVC56923.

Tampa Bay Solar maintains a 4.8-star Google rating from over 230 reviews, with customers praising the company’s responsiveness, individualized attention, and willingness to address concerns. The company serves residential and commercial clients throughout Hillsborough, Pinellas, Pasco, Polk, and Manatee counties.

Service Area

Tampa Bay Solar serves the following areas within a 62-mile radius:

TampaSt. PetersburgClearwaterBrandonLakeland

Are you Tampa Bay Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
system_design

Certifications & Accreditations

FSEC

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

230 reviews

Verified Customer

10 September 2025
Verified Customer

Tampa Bay Solar exceeded our expectations. Steve and his team were professional, thorough, and completed the installation ahead of schedule.

Verified Customer

22 July 2025
Verified Customer

Veteran-owned and it shows in their discipline and attention to detail. The system was designed specifically for our home and is performing great.

Verified Customer

14 May 2025
Verified Customer

From the free home energy audit to the final inspection, Tampa Bay Solar handled everything with precision. Highly recommend.

Frequently Asked Questions About Tampa Bay Solar

What services does Tampa Bay Solar offer?

Tampa Bay Solar offers Solar Installation, Battery Storage, system_design.

Is Tampa Bay Solar NABCEP certified?

Tampa Bay Solar holds the following certifications: FSEC. Contact them directly for the latest accreditation details.

What areas does Tampa Bay Solar serve?

Tampa Bay Solar serves Tampa, St. Petersburg, Clearwater, Brandon, Lakeland. They are based in Tampa with a service radius of 100 km.

What warranty does Tampa Bay Solar offer?

Tampa Bay Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Tampa Bay Solar's customer reviews?

Tampa Bay Solar has a 4.8/5 rating based on 230 customer reviews. Customers consistently rate them highly.

How long has Tampa Bay Solar been in business?

Tampa Bay Solar was founded in 2011 and has been in business for 15 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Tampa Bay Solar

Fill in your details and we'll connect you with Tampa Bay Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote