Tapps Electric
Family-owned BBB A+ rated electrical contractor providing solar, HVAC, and electrical services in Pierce County
7+
Years in Business
15
Customer Reviews
37 mi
Service Area
11-50
Employees
SurgePV Score
About Tapps Electric
Tapps Electric is a family-owned electrical contractor and solar installer based at 1202 Main Street, Suite 103, Sumner, WA 98390, serving the greater Tacoma and Pierce County area. Founded in 2019 by William Morris, the company provides residential, commercial, and industrial solar installation alongside full electrical and HVAC services.
The company holds BBB accreditation with an A+ rating and employs union-certified electricians. Tapps Electric serves customers throughout the Seattle, Tacoma, and Olympia corridor, with a focus on the South Puget Sound region.
Tapps Electric offers free estimates for solar panel installations and can be reached by phone or email during business hours.
Service Area
Tapps Electric serves the following areas within a 37-mile radius:
Contact Information
Are you Tapps Electric?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
15 reviews
Verified Customer
Tapps Electric installed our solar system and it has been working flawlessly. The union electricians did top-quality work and the whole process was smooth from quote to final inspection.
Verified Customer
Great family-owned company. They were transparent about pricing, handled all the permitting, and the installation crew was professional and efficient. Highly recommend.
Verified Customer
Good experience overall. The team was knowledgeable and the installation was completed on time. The system is producing well and we are seeing savings on our utility bill.
Frequently Asked Questions About Tapps Electric
What services does Tapps Electric offer?
Tapps Electric offers Solar Installation, Battery Storage, EV Charging.
Is Tapps Electric NABCEP certified?
Tapps Electric holds the following certifications: BBB A+ Rated, BBB Accredited, Union Certified Electricians. Contact them directly for the latest accreditation details.
What areas does Tapps Electric serve?
Tapps Electric serves Tacoma, Sumner, Puyallup, Bonney Lake, Lake Tapps, Olympia. They are based in Tacoma with a service radius of 60 km.
What warranty does Tapps Electric offer?
Tapps Electric offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Tapps Electric's customer reviews?
Tapps Electric has a 4.8/5 rating based on 15 customer reviews. Customers consistently rate them highly.
How long has Tapps Electric been in business?
Tapps Electric was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.
Similar Installers in Tacoma
Get a Free Solar Quote from Tapps Electric
Fill in your details and we'll connect you with Tapps Electric.
Quote request sent!
Tapps Electric will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile