TS

Tempo Solar World

Las Vegas Valley solar staple since 1997 with nearly three decades of residential and commercial installation experience

Henderson, Nevada
4.7 (34 reviews)
Verified
Residential Commercial

29+

Years in Business

0

34

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

8.1 / 10
Customer Reviews
94%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
75%

About Tempo Solar World

Tempo Solar World is a solar installation company located at 4760 W Dewey Drive, Suite 119, in Las Vegas, Nevada, serving Henderson and the greater Las Vegas Valley. Founded in 1997, the company has been a trusted solar installer in the Vegas valley for nearly three decades, making them one of the longest-established solar companies in southern Nevada.

Tempo Solar World provides residential and commercial solar panel installations along with consultation and maintenance services. The company’s decades of experience in the Las Vegas market means they understand the specific solar conditions, building codes, and utility requirements of the region.

The company has earned a 4.7-star rating on EcoWatch and maintains BBB accreditation. Tempo Solar World serves Henderson, Las Vegas, North Las Vegas, and surrounding communities across the Las Vegas Valley.

Service Area

Tempo Solar World serves the following areas within a 50-mile radius:

HendersonLas VegasNorth Las VegasBoulder CitySummerlinGreen Valley

Are you Tempo Solar World?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Maintenance
Solar Design

Certifications & Accreditations

BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

34 reviews

Michael S.

2 September 2025
Verified Customer

Tempo Solar has been around since 1997, and their longevity in the Las Vegas market speaks volumes. Our installation was handled by experienced pros who knew exactly what they were doing.

Jennifer R.

15 June 2025
Verified Customer

We chose Tempo for their nearly 30 years of experience in the Vegas valley. The consultation was thorough and the installation quality was excellent.

David C.

10 March 2025
Verified Customer

Solid company with a long track record. They designed a system that takes full advantage of our Henderson rooftop's sun exposure. Good customer support.

Frequently Asked Questions About Tempo Solar World

What services does Tempo Solar World offer?

Tempo Solar World offers Solar Installation, Maintenance, Solar Design.

Is Tempo Solar World NABCEP certified?

Tempo Solar World holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Tempo Solar World serve?

Tempo Solar World serves Henderson, Las Vegas, North Las Vegas, Boulder City, Summerlin, Green Valley. They are based in Henderson with a service radius of 80 km.

What warranty does Tempo Solar World offer?

Tempo Solar World offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Tempo Solar World's customer reviews?

Tempo Solar World has a 4.7/5 rating based on 34 customer reviews. Customers consistently rate them highly.

How long has Tempo Solar World been in business?

Tempo Solar World was founded in 1997 and has been in business for 29 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Tempo Solar World

Fill in your details and we'll connect you with Tempo Solar World.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote