TS

Tempo Solar World

Las Vegas solar and electrical contractor since 1997 with BBB accreditation and full-service residential and commercial installations

Las Vegas, Nevada
4.7 (34 reviews)
Verified
Residential Commercial

29+

Years in Business

0

34

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

8.6 / 10
Customer Reviews
94%
Certifications
75%
Experience
100%
Services Range
90%
Warranty Coverage
63%
Online Presence
75%

About Tempo Solar World

Tempo Solar World is a Las Vegas-based solar and electrical contractor that has served the Southern Nevada area since 1997. Owned by Laszlo Kiraly, the company is located at 4760 W Dewey Dr, Suite 119 in Las Vegas and provides both residential and commercial solar installations, including roof-mounted, ground-mounted, and pole-mounted systems.

The company has been BBB accredited since April 2021 and maintains a 5.0-star rating on HomeAdvisor. With nearly three decades of experience in electrical contracting, Tempo Solar World brings deep technical expertise to every solar installation project. The company handles system design, permitting, installation, and maintenance.

Tempo Solar World serves Las Vegas, Henderson, North Las Vegas, Spring Valley, and Summerlin. The company provides free solar consultations, custom system design, and ongoing maintenance services for both residential and commercial customers across the Las Vegas Valley.

Service Area

Tempo Solar World serves the following areas within a 50-mile radius:

Las VegasHendersonNorth Las VegasSpring ValleySummerlin

Are you Tempo Solar World?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Solar Design
electrical_services

Certifications & Accreditations

BBB Accredited NV Contractor License

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

34 reviews

James H.

20 July 2025
Verified Customer

Tempo Solar World handled our roof-mounted system installation professionally. Their decades of electrical experience shows in the quality of their work.

Patricia G.

10 May 2025
Verified Customer

Great experience with Tempo. They explained every step of the process and the installation was completed on schedule. Our electric bill is now a fraction of what it was.

Chris M.

18 February 2025
Verified Customer

Solid installation and good communication throughout the project. The team was knowledgeable and answered all our questions about how solar works with NV Energy.

Frequently Asked Questions About Tempo Solar World

What services does Tempo Solar World offer?

Tempo Solar World offers Solar Installation, Battery Storage, Maintenance, Solar Design, electrical_services.

Is Tempo Solar World NABCEP certified?

Tempo Solar World holds the following certifications: BBB Accredited, NV Contractor License. Contact them directly for the latest accreditation details.

What areas does Tempo Solar World serve?

Tempo Solar World serves Las Vegas, Henderson, North Las Vegas, Spring Valley, Summerlin. They are based in Las Vegas with a service radius of 80 km.

What warranty does Tempo Solar World offer?

Tempo Solar World offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Tempo Solar World's customer reviews?

Tempo Solar World has a 4.7/5 rating based on 34 customer reviews. Customers consistently rate them highly.

How long has Tempo Solar World been in business?

Tempo Solar World was founded in 1997 and has been in business for 29 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Tempo Solar World

Fill in your details and we'll connect you with Tempo Solar World.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote