Top Tier Solar Solutions
Inc. 5000 ranked residential solar company serving the Raleigh-Durham Triangle from its Charlotte headquarters
7+
Years in Business
446
Customer Reviews
124 mi
Service Area
51-200
Employees
SurgePV Score
About Top Tier Solar Solutions
Top Tier Solar Solutions serves the Raleigh-Durham Triangle from its headquarters at 1530 Center Park Dr, Suite 2911, Charlotte, NC 28217. The company ranked No. 4 on the 2024 Inc. 5000 list, reflecting rapid growth since its founding in 2019. Top Tier holds electrical licenses in North Carolina, South Carolina, Virginia, and several other states, and maintains BBB A+ accreditation.
The company focuses on residential solar and uses American-made panels from Silfab and Q Cells, paired with Enphase and SolarEdge inverters and Enphase battery storage. Top Tier also offers roofing services, which allows Raleigh-area homeowners to bundle a new roof with their solar installation under a single contractor. The company handles sales, design, permitting, and installation in-house through its vertically integrated service model.
Top Tier Solar Solutions has a 4.2-star average from 446 BBB reviews and an 88% recommendation rate on Facebook. The company provides a 25-year warranty covering panels, equipment, and workmanship. For Triangle-area homeowners whose roofs need replacement before going solar, the bundled roof-plus-solar option can simplify the process and potentially reduce overall costs. Prospective customers should request detailed production estimates and compare them against actual system performance data.
Service Area
Top Tier Solar Solutions serves the following areas within a 124-mile radius:
Contact Information
Are you Top Tier Solar Solutions?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
25 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.2
446 reviews
Alex T.
Top Tier installed a 24-panel system on our Raleigh home in a single day. The American-made Silfab panels were a deciding factor for us. System production has been matching the estimates they provided.
Karen W.
Solid installation and competitive pricing compared to other Triangle-area quotes we received. The team was professional and the system looks great. Minor delays in permitting but that was expected.
Mike J.
We bundled a roof replacement with solar which saved us money overall. The installation quality was good and the 25-year warranty gives peace of mind. Would recommend getting a detailed production estimate upfront.
Frequently Asked Questions About Top Tier Solar Solutions
What services does Top Tier Solar Solutions offer?
Top Tier Solar Solutions offers Solar Installation, Battery Storage, roofing, Solar Design.
Is Top Tier Solar Solutions NABCEP certified?
Top Tier Solar Solutions holds the following certifications: BBB A+ Rating, Licensed Electrical Contractor (NC, SC, VA). Contact them directly for the latest accreditation details.
What areas does Top Tier Solar Solutions serve?
Top Tier Solar Solutions serves Raleigh, Durham, Cary, Chapel Hill, Greensboro, Winston-Salem, Fayetteville. They are based in Raleigh with a service radius of 200 km.
What warranty does Top Tier Solar Solutions offer?
Top Tier Solar Solutions offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.
How are Top Tier Solar Solutions's customer reviews?
Top Tier Solar Solutions has a 4.2/5 rating based on 446 customer reviews. They are well-regarded by their customers.
How long has Top Tier Solar Solutions been in business?
Top Tier Solar Solutions was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.
Similar Installers in Raleigh
Get a Free Solar Quote from Top Tier Solar Solutions
Fill in your details and we'll connect you with Top Tier Solar Solutions.
Quote request sent!
Top Tier Solar Solutions will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile