Trident Solar
Veteran-owned NABCEP certified solar EPC contractor in Virginia Beach delivering residential and commercial installations with a 30-year warranty
2026+
Years in Business
10
Customer Reviews
62 mi
Service Area
2-10
Employees
SurgePV Score
About Trident Solar
Trident Solar is a veteran-owned Engineering, Procurement, and Construction solar contractor based at 521 Central Drive, Suite 201 in Virginia Beach, Virginia. The company is led by president Matt Shorrock, a retired Navy SEAL, and operates as a Virginia Class A contractor with an Alternative Energy Systems specialty license. Both the president and operations manager hold board certifications as PV Installation Professionals through the North American Board of Certified Energy Practitioners.
Trident Solar provides residential and commercial solar installation, system design, battery storage, permitting, and maintenance services across the Hampton Roads region. Every installation is protected by a 30-year insurance-backed warranty through Solar Insure that covers service, repair, and labor costs. The company emphasizes integrity, professionalism, and technical expertise in every project.
Trident Solar serves Virginia Beach, Norfolk, Chesapeake, Hampton, Newport News, Suffolk, and surrounding communities in southeastern Virginia.
Service Area
Trident Solar serves the following areas within a 62-mile radius:
Contact Information
Are you Trident Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
30 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
10 reviews
Ryan G.
Trident Solar is run by professionals who know what they are doing. The NABCEP certification gave us confidence and the installation was completed to a high standard. The 30-year warranty sealed the deal for us.
Katherine L.
We chose Trident because of their military background and integrity-first approach. Matt and the team delivered on every promise. Our system is producing great results.
Steven B.
Solid company with knowledgeable staff. The design process was thorough and they explained all the technical details clearly. Professional installation crew.
Frequently Asked Questions About Trident Solar
What services does Trident Solar offer?
Trident Solar offers Solar Installation, Solar Design, Battery Storage, permitting, Maintenance.
Is Trident Solar NABCEP certified?
Trident Solar holds the following certifications: NABCEP PV Installation Professional, Virginia Class A Licensed, Alternative Energy Systems Specialty License. Contact them directly for the latest accreditation details.
What areas does Trident Solar serve?
Trident Solar serves Virginia Beach, Norfolk, Chesapeake, Hampton, Newport News, Suffolk. They are based in Virginia Beach with a service radius of 100 km.
What warranty does Trident Solar offer?
Trident Solar offers 25-year panel warranty, 25-year inverter warranty, and 30-year installation/workmanship warranty.
How are Trident Solar's customer reviews?
Trident Solar has a 4.5/5 rating based on 10 customer reviews. Customers consistently rate them highly.
How long has Trident Solar been in business?
Trident Solar was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Virginia Beach
Get a Free Solar Quote from Trident Solar
Fill in your details and we'll connect you with Trident Solar.
Quote request sent!
Trident Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile