Solar Installers in Columbus, Ohio

10 Companies 515 Reviews 4.7 Avg
All ResidentialCommercialIndustrial

Top Solar Installers in Columbus

Ranked by rating and customer reviews

PU
1

Power Up Renewable Energy

Verified
5.0 (20 reviews)
Est. 2010 · Columbus, Ohio · 25yr warranty
SolarDesignMaintenanceMonitoring

NABCEP · State of Ohio Electric License

VS
2

Vespa Solar

5.0 (10 reviews)
Est. 2021 · Columbus, Ohio · 30yr warranty
SolarBatteryDesignRoof Assessment
GP
3

Gold Path Solar

Verified
4.9 (120 reviews)
Est. 2022 · Columbus, Ohio · 25yr warranty
SolarBatteryDesignMonitoring

NABCEP Installation Professional · NABCEP System Inspector · Enphase Certified Gold Installer · Enphase Certified Battery Installer

Q Cells + Enphase

OP
4

Ohio Power Solutions

Verified
4.9 (35 reviews)
Est. 2009 · Columbus, Ohio · 25yr warranty
SolarBatteryDesignMaintenance

NABCEP

SMA

GR
5

Green Rack Solar

Verified
4.8 (60 reviews)
Est. 2019 · Columbus, Ohio · 25yr warranty
SolarBatteryDesignMaintenance

NABCEP · Tesla Powerwall Certified Installer · Enphase Platinum Installer · Q Cells Q.Partner

Q Cells + Enphase

Y
6

YellowLite

Verified
4.6 (100 reviews)
Est. 2009 · Columbus, Ohio · 25yr warranty
SolarBatteryDesignEnergy Audit

BBB Accredited

Enphase

ES
7

EcoHouse Solar

Verified
4.5 (40 reviews)
Est. 2008 · Columbus, Ohio · 25yr warranty
SolarDesignMonitoringMaintenance

NABCEP

JinkoSolar + Enphase

KS
8

Kokosing Solar

Verified
4.5 (80 reviews)
Est. 2000 · Columbus, Ohio · 25yr warranty
SolarBatteryEV ChargingDesign

NABCEP · Authorized SunPower Dealer · BBB A+ Rating

SunPower + Enphase

SS
9

Stardust Solar Columbus

4.5 (15 reviews)
Est. 2017 · Columbus, Ohio · 25yr warranty
SolarBatteryEV ChargingDesign
DS
10

Dovetail Solar and Wind

Verified
4.4 (35 reviews)
Est. 1995 · Columbus, Ohio · 25yr warranty
SolarBatteryDesignMaintenance

BBB Accredited

What Solar Costs in Columbus

$2.50-$3.50

Cost per Watt

$20,000-$28,000

Typical 8kW System

8-12 yrs

Payback Period

$1,400-$2,400

Annual Savings (8kW)

Based on national averages. The 30% federal residential tax credit expired Dec 31, 2025. State and local incentives may reduce your net cost. Get quotes from multiple installers for accurate pricing.

How We Rank Solar Installers

Our rankings combine verified customer reviews, certification status, years of experience, service range, and warranty coverage into a single SurgePV Score.

Customer Reviews

We aggregate ratings from Google, Yelp, BBB, and SolarReviews.

Certifications

NABCEP certification is the US gold standard. We also check state licensing and manufacturer certifications.

Track Record

Years in business, projects completed, and warranty coverage contribute to the overall score.

Why Trust the SurgePV Directory?

Every company listed here has been independently researched and verified. We check certifications, aggregate reviews from multiple platforms, and verify that every business is actively trading. Companies cannot pay to improve their ranking.

10

Verified Companies

515

Customer Reviews

Solar Installation in Columbus, Ohio

Columbus homeowners are investing in solar to reduce electricity bills and increase property value. A typical residential system generates 9,600-14,400 kWh per year, offsetting 80-100% of household electricity use depending on system size and roof orientation.

How to Choose an Installer in Columbus

Start by checking NABCEP certification and Ohio state contractor licensing. Get at least three written quotes that include equipment specifications, total cost, expected annual production, and warranty terms. Compare not just price, but also equipment quality, warranty length, and the company's track record in Columbus.

What to Expect

The process from signing a contract to turning on your system takes 6-12 weeks. Your installer handles design, permitting, installation (1-3 days), inspection, and utility interconnection. Once the utility grants Permission to Operate (PTO), your system goes live and starts generating savings.

More Cities in Ohio

Find solar installers in other Ohio cities

For Solar Installers

Design Faster. Sell More.

SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.

Solar Installation: Step by Step

1

Free Consultation

Contact an installer for a free site assessment. They'll evaluate your roof, shading, and energy usage.

2

Design & Quote

Receive a detailed proposal with system size, costs, available state incentives, and projected returns.

3

Permitting

Your installer handles building permits, HOA approvals, and utility interconnection applications.

4

Installation

Panels, inverter, and wiring are installed in 1-3 days. Followed by city inspection.

5

Permission to Operate

Utility grants PTO, system goes live, and you start generating clean energy.

Frequently Asked Questions

How much do solar panels cost in Columbus?

Solar panel costs in Columbus typically range from $2.50-$3.50 per watt. A standard 8kW residential system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so this is the full out-of-pocket cost. Ohio state and local incentives, net metering, and SRECs may help reduce your net cost.

Who is the best solar installer in Columbus?

The best solar installer in Columbus depends on your needs, budget, and project type. Check ratings, reviews, certifications (NABCEP), and experience on this page. Get quotes from at least three installers to compare.

How long does solar installation take?

Physical installation takes 1-3 days. The full process from contract to Permission to Operate typically takes 6-12 weeks, including design, permitting, installation, inspection, and utility interconnection.

Do I need permits for solar panels?

Yes. Solar installations require building and electrical permits. Your installer handles all permitting, including HOA approval and utility interconnection. Some jurisdictions use SolarAPP+ for same-day automated approvals.

What solar incentives are available in Columbus?

The 30% federal residential clean energy tax credit (ITC) expired on December 31, 2025. However, Ohio may offer state-level incentives such as rebates, performance-based incentives, or solar renewable energy certificates (SRECs). Net metering policies vary by utility — check with your local utility in Columbus to see if they offer full retail credit for exported solar power. Your installer should walk you through all available incentives during the quoting process.

How much can I save with solar panels in Columbus?

Savings depend on your electricity rate, system size, and sun exposure. A typical 8kW system offsets $1,400-$2,400 per year in electricity costs. Over 25 years, total savings typically range from $25,000-$50,000. Your installer can provide a detailed savings estimate based on your specific utility rate and energy usage.

Should I get battery storage with my solar panels?

Battery storage ($12,000-$18,000 installed) is worth considering if you have time-of-use electricity rates, experience frequent power outages, or want energy independence. Without favorable net metering, batteries help you use more of your own solar power instead of exporting it at lower rates. Popular options include Tesla Powerwall, Enphase IQ Battery, and Franklin WH.

What equipment should I look for?

Top-tier solar panels include REC, Q Cells, Canadian Solar, and Silfab. For inverters, Enphase microinverters (25-year warranty) and SolarEdge optimizers are the most popular. Your installer should offer multiple equipment options at different price points and explain the trade-offs.

Are You a Solar Installer in Columbus?

List your company for free and connect with local customers looking for solar installation services.

List Your Company Free