Voltric Electric
Locally owned Spokane electrical and solar contractor with over 35 years of experience since 1987
39+
Years in Business
13
Customer Reviews
50 mi
Service Area
2-10
Employees
SurgePV Score
About Voltric Electric
Voltric Electric is a locally owned and operated electrical contracting company based in Spokane, WA 99203. Established in 1987, the company has over 35 years of experience providing electrical and solar services to residential and commercial customers across the Spokane area.
Voltric Electric offers solar design and installation alongside a full range of electrical contracting services. The company holds BBB accreditation and has built a strong reputation in the Spokane community for reliable workmanship and honest service.
With a BuildZoom score that places them in the top tier of Washington licensed contractors, Voltric Electric brings decades of local experience to every solar and electrical project in the Spokane metropolitan area.
Service Area
Voltric Electric serves the following areas within a 50-mile radius:
Contact Information
Are you Voltric Electric?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
13 reviews
Verified Customer
Voltric Electric has been in Spokane for decades and their experience shows. Clean solar installation and great follow-up service.
Verified Customer
Professional and reliable. The team designed a solar system that works well for our home and handled all the permitting.
Verified Customer
Good experience with Voltric for our solar project. The company's long history in Spokane gave us confidence in their work.
Frequently Asked Questions About Voltric Electric
What services does Voltric Electric offer?
Voltric Electric offers Solar Installation, Maintenance.
Is Voltric Electric NABCEP certified?
Voltric Electric holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.
What areas does Voltric Electric serve?
Voltric Electric serves Spokane, Spokane Valley, Liberty Lake, Cheney. They are based in Spokane with a service radius of 80 km.
What warranty does Voltric Electric offer?
Voltric Electric offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Voltric Electric's customer reviews?
Voltric Electric has a 4.5/5 rating based on 13 customer reviews. Customers consistently rate them highly.
How long has Voltric Electric been in business?
Voltric Electric was founded in 1987 and has been in business for 39 years. They are one of the more experienced solar installers in their area.
Similar Installers in Spokane
Get a Free Solar Quote from Voltric Electric
Fill in your details and we'll connect you with Voltric Electric.
Quote request sent!
Voltric Electric will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile