WS

Western Solar Solutions

Clean energy systems for commercial and residential clients in the Seattle metro area

Seattle, Washington
4.5 (10 reviews)
Residential Commercial

2026+

Years in Business

0

10

Customer Reviews

50 mi

Service Area

1-10

Employees

SurgePV Score

6.3 / 10
Customer Reviews
90%
Certifications
0%
Experience
100%
Services Range
60%
Warranty Coverage
63%
Online Presence
50%

About Western Solar Solutions

Western Solar Solutions is a Seattle-based solar energy company located at 1652 20th Ave in Seattle’s Central District. The company provides solar panel installation and battery storage solutions for residential and commercial clients in the greater Seattle area.

Western Solar Solutions focuses on designing and implementing clean energy delivery systems tailored to each client’s property and energy needs. The company handles site assessments, system design, permitting, and installation, working with clients to optimize system sizing and energy production.

The company can be reached at (206) 484-4100 or via email at [email protected]. Western Solar Solutions serves the Seattle metropolitan area including Bellevue and Renton.

Service Area

Western Solar Solutions serves the following areas within a 50-mile radius:

SeattleBellevueRenton

Are you Western Solar Solutions?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

10 reviews

Central District Homeowner

10 August 2025
Verified Customer

Western Solar Solutions provided a thorough assessment and designed a system that fits our roof perfectly. Installation was quick and professional.

Seattle Customer

22 May 2025
Verified Customer

Good value for a quality solar installation. The team was responsive and helped us understand our energy production expectations.

Frequently Asked Questions About Western Solar Solutions

What services does Western Solar Solutions offer?

Western Solar Solutions offers Solar Installation, Battery Storage.

Is Western Solar Solutions NABCEP certified?

Western Solar Solutions holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Western Solar Solutions serve?

Western Solar Solutions serves Seattle, Bellevue, Renton. They are based in Seattle with a service radius of 80 km.

What warranty does Western Solar Solutions offer?

Western Solar Solutions offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Western Solar Solutions's customer reviews?

Western Solar Solutions has a 4.5/5 rating based on 10 customer reviews. Customers consistently rate them highly.

How long has Western Solar Solutions been in business?

Western Solar Solutions was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Western Solar Solutions

Fill in your details and we'll connect you with Western Solar Solutions.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote