Yes Solar Solutions
North Carolina's only NABCEP-accredited solar company — over 2,500 systems installed since 2009
17+
Years in Business
2,500+
Projects Completed
134
Customer Reviews
75 mi
Service Area
11-50
Employees
SurgePV Score
About Yes Solar Solutions
Yes Solar Solutions is a Cary-based solar installer founded in 2009 by co-owners Stew and Kathy Miller. Located at 202 N. Dixon Ave, Cary, NC 27513, the company serves Durham, Raleigh, Chapel Hill, and the broader Triangle region with residential and commercial solar, battery storage, and EV charging installations.
Yes Solar Solutions is the only company in North Carolina with full NABCEP company accreditation, the gold standard set by the North American Board of Certified Energy Practitioners. The company was the first Tesla Powerwall certified installer in North Carolina and holds unlimited general and electrical contractor licenses for both NC and SC. They install REC and SunPower panels with Enphase and SolarEdge inverter options.
With over 2,500 solar systems installed, Yes Solar Solutions holds a 4.9-star rating on EnergySage from 134 reviews. The company provides turnkey service including design, engineering, permitting, interconnection, commissioning, inspection, and quality assurance, followed by a post-installation review of all warranties and documentation.
Service Area
Yes Solar Solutions serves the following areas within a 75-mile radius:
Contact Information
Are you Yes Solar Solutions?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
134 reviews
Verified Customer
Yes Solar designed a system that exceeded our production estimates. As the only NABCEP-accredited company in NC, their technical expertise is unmatched.
Verified Customer
Smooth turnkey process from design through commissioning. They handled all permitting and interconnection without any hiccups.
Verified Customer
Stew and his team are knowledgeable and transparent. The post-installation review of warranties and documentation was a great touch.
Frequently Asked Questions About Yes Solar Solutions
What services does Yes Solar Solutions offer?
Yes Solar Solutions offers Solar Installation, Battery Storage, EV Charging, Maintenance.
Is Yes Solar Solutions NABCEP certified?
Yes Solar Solutions holds the following certifications: NABCEP Accredited Company, Tesla Powerwall Certified, REC Certified Installer, SolarEdge Preferred Partner, Licensed General Contractor NC/SC, Licensed Electrical Contractor NC/SC. Contact them directly for the latest accreditation details.
What areas does Yes Solar Solutions serve?
Yes Solar Solutions serves Durham, Cary, Raleigh, Chapel Hill, Apex. They are based in Durham with a service radius of 120 km.
What warranty does Yes Solar Solutions offer?
Yes Solar Solutions offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Yes Solar Solutions's customer reviews?
Yes Solar Solutions has a 4.9/5 rating based on 134 customer reviews. Customers consistently rate them highly.
How long has Yes Solar Solutions been in business?
Yes Solar Solutions was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Durham
Get a Free Solar Quote from Yes Solar Solutions
Fill in your details and we'll connect you with Yes Solar Solutions.
Quote request sent!
Yes Solar Solutions will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile