YS

Yes Solar Solutions

The only NABCEP-accredited solar company in the Carolinas with 1,000+ custom installations since 2009

Raleigh, North Carolina
4.9 (134 reviews)
Verified
Residential Commercial

17+

Years in Business

1,000+

Projects Completed

134

Customer Reviews

75 mi

Service Area

11-50

Employees

SurgePV Score

9.6 / 10
Customer Reviews
98%
Certifications
100%
Experience
100%
Services Range
90%
Warranty Coverage
80%
Online Presence
100%

About Yes Solar Solutions

Yes Solar Solutions is a locally owned solar company based at 202 N Dixon Ave, Cary, NC 27513, serving the greater Raleigh-Durham Triangle. Founded in 2009, the company has completed over 1,000 custom solar installations for homes and businesses. Yes Solar Solutions is the only solar installer in the Carolinas to hold full NABCEP company accreditation, a distinction earned through a rigorous audit of training, customer satisfaction, design standards, and installation quality.

Yes Solar was the first company in the Carolinas certified by Tesla for both Powerwall installation and EV charging. The company installs panels from Q Cells, REC, and Silfab, paired with Enphase and SolarEdge inverters and Tesla Powerwall and Enphase battery storage. The team holds both General Contractor and Electrical licenses and handles all project phases in-house, from site assessment and design through permitting, installation, and monitoring setup.

Yes Solar Solutions has earned a 4.9-star rating on EnergySage from 134 verified reviews and has been named to the Top Solar Contractors list in the U.S. for eight consecutive years. The company holds an A+ BBB rating and numerous five-star ratings on Guild Quality and Google. Business hours are Monday through Friday, 8:00 AM to 5:00 PM.

Service Area

Yes Solar Solutions serves the following areas within a 75-mile radius:

RaleighCaryDurhamChapel HillApexHolly SpringsMorrisvilleWake Forest

Are you Yes Solar Solutions?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Solar Design
Monitoring

Certifications & Accreditations

NABCEP Accredited Company Tesla Powerwall Certified Tesla EV Charging Certified BBB A+ Rating

Partner Manufacturers

Panels

Q CellsRECSilfab

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

134 reviews

John R.

18 September 2025
Verified Customer

Yes Solar installed a 12 kW system with Tesla Powerwall on our Cary home. Their NABCEP-accredited team designed the system to maximize our south and west facing roofs. Production has been spot on with projections.

Linda H.

10 May 2025
Verified Customer

We chose Yes Solar because they are the only NABCEP-accredited company in the Carolinas. That level of certification matters. The installation was clean and professional, and the crew finished ahead of schedule.

Peter G.

5 December 2024
Verified Customer

Had Yes Solar install solar panels and a Tesla Powerwall together. They coordinated the whole project seamlessly. The battery has kept our house running through two power outages already. Very satisfied.

Frequently Asked Questions About Yes Solar Solutions

What services does Yes Solar Solutions offer?

Yes Solar Solutions offers Solar Installation, Battery Storage, EV Charging, Solar Design, Monitoring.

Is Yes Solar Solutions NABCEP certified?

Yes Solar Solutions holds the following certifications: NABCEP Accredited Company, Tesla Powerwall Certified, Tesla EV Charging Certified, BBB A+ Rating. Contact them directly for the latest accreditation details.

What areas does Yes Solar Solutions serve?

Yes Solar Solutions serves Raleigh, Cary, Durham, Chapel Hill, Apex, Holly Springs, Morrisville, Wake Forest. They are based in Raleigh with a service radius of 120 km.

What warranty does Yes Solar Solutions offer?

Yes Solar Solutions offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Yes Solar Solutions's customer reviews?

Yes Solar Solutions has a 4.9/5 rating based on 134 customer reviews. Customers consistently rate them highly.

How long has Yes Solar Solutions been in business?

Yes Solar Solutions was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Yes Solar Solutions

Fill in your details and we'll connect you with Yes Solar Solutions.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote