TL;DR: SurgePV ranks #1 for solar proposal software in the UK — the only platform combining design-to-proposal workflow, integrated SLD generation, Smart Export Guarantee modelling, battery storage ROI, and GBP financial analysis in one cloud platform at ~GBP 1,199/user/year. Eliminates the 1–2 hour manual proposal process. Runner-ups: Aurora Solar for enterprise residential workflows, OpenSolar for free basic proposals, Pylon for UK-native proposals, and Excel templates for the smallest teams.
Speed wins deals in UK solar. Homeowners request 3–5 quotes. The installer who delivers a professional, accurate proposal first has a measurable advantage.
There has never been more financial detail to get right: residential electricity at 24–28p/kWh (Ofgem). 0% VAT on solar. Smart Export Guarantee payments between 3–15p/kWh. Battery storage ROI. Time-of-use tariff arbitrage. Get any of it wrong, and you lose the customer’s trust at the most critical moment.
Still assembling proposals in Excel? Cobbling together outputs from 3–4 different tools? The problem is familiar: 1–2 hours per proposal, battery storage adds another layer of complexity, and every hour spent on manual proposals is an hour not spent selling.
The best solar proposal software for the UK in 2026 needs to handle five things well: accurate SEG payment modelling, self-consumption savings at current electricity rates, battery storage ROI with time-of-use tariffs, 0% VAT calculations, and professional GBP-denominated customer-facing documents.
We tested and compared the top 5 solar software platforms for the UK proposal market, evaluating each on financial accuracy, proposal quality, UK tariff modelling, and design integration.
In this guide, you will find:
- Which platform handles UK financial modelling best (SEG, batteries, TOU tariffs)
- How proposal speed compares across all 5 tools
- Which tool delivers the most professional customer-facing proposals
- Our recommendation based on 500+ commercial projects across Europe
Who this guide is for:
- MCS-certified residential solar installers competing on quote quality
- Commercial solar EPCs needing ECA and battery ROI modelling
- Solar sales teams wanting faster quote turnaround
- Businesses evaluating proposal software for the UK market
Quick Comparison: Top 5 Solar Proposal Tools for the UK
| Feature | SurgePV | Aurora Solar | OpenSolar | Pylon | Excel Templates |
|---|---|---|---|---|---|
| Best For | End-to-end EPCs | Enterprise residential | Budget installers | UK-native proposals | Very small teams |
| SEG Modelling | Supplier-specific | Basic export | Basic | UK-focused | Manual |
| Battery ROI | Full (TOU, self-consumption) | Good | Basic | Basic | Manual |
| 0% VAT | Native | Manual | Manual | Yes | Manual |
| GBP Proposals | Professional | Professional | Customer-facing | GBP native | Basic formatting |
| Design Integration | Full (SLD included) | Full (no SLD) | Basic design | Separate tool | None |
| SLD Generation | Automated (5–10 min) | No | No | No | No |
| Time per Proposal | 15–20 min | 20–30 min | 25–35 min | 15–25 min | 60–120 min |
| Pricing (GBP/yr) | ~GBP 1,199/user | GBP 2,100–8,000+ | Free | Contact sales | Free |
Best Solar Proposal Software in the United Kingdom
SurgePV — Best Design-to-Proposal Platform for the UK
Best For: UK EPCs and installers needing end-to-end design-to-proposal workflow
Pricing: ~GBP 1,199/user/year ($1,499) | See pricing
Proposal Quality: Excellent
Overall Score: 95/100
SurgePV is the only platform that connects solar design, electrical engineering, and proposal generation in a single workflow. For UK installers, this means proposal data comes directly from the design — no re-entering system specifications, no exporting between tools, no inconsistencies between what you designed and what you quoted.
UK Financial Modelling Built In
SurgePV’s financial modelling engine handles every UK-specific calculation your proposals need:
- Smart Export Guarantee: Model SEG payments at supplier-specific rates (3–15p/kWh), including time-of-export tariffs
- Self-consumption savings: Calculated against current Ofgem price cap rates (24–28p/kWh residential)
- Battery storage ROI: Self-consumption increase, time-of-use arbitrage (Octopus Agile, Flux), grid services
- 0% VAT: Automatically applied for residential solar installations since April 2022 (extended to March 2027)
- Enhanced Capital Allowances: 100% first-year tax relief for commercial installations
- 25-year cash flow projections: In GBP, with degradation modelling and electricity price escalation
Integrated SLD = Stronger Proposals
SurgePV includes automated SLD generation — producing IEC-compliant single line diagrams in 5–10 minutes from your system design. No other proposal platform includes this. Commercial clients and savvy residential buyers want to see the electrical documentation. Including a professional SLD in your proposal demonstrates engineering capability that Excel templates and basic proposal tools cannot match.
Manual AutoCAD SLD drafting takes 2–3 hours and costs GBP 1,600+/year in licensing. When you are quoting 20+ projects per month, that is 40–60 hours of drafting time you could be using to close deals.
Proposal Speed and Quality
From completed design to finished proposal: 15–20 minutes. The proposal pulls system specifications, financial modelling, shading analysis results, and production data directly from the design. Output formats include interactive web links (shareable, mobile-friendly) and PDF exports.
Pro Tip
In the UK residential market, the installer who delivers a professional proposal within 24 hours of the site visit wins more deals. SurgePV’s 15–20 minute turnaround means your team can send proposals the same day. Book a demo to see the UK proposal workflow in action.
Key Strengths
- End-to-end: Design-to-proposal in one platform with integrated SLD (5–10 min). No copy-paste errors, no formatting headaches, no separate proposal software licence.
- UK Financials: SEG, battery ROI, 0% VAT, ECA, Octopus Agile/Flux. Every UK-specific calculation handled natively.
- Bankable: P50/P90 reports within ±3% of PVsyst. Your financing applications include the bankability data lenders actually require.
- Transparent Pricing: ~GBP 1,199/user/year, all features included.
Limitations
- UK Market Presence: Newer compared to established UK platforms.
- MCS Integration: Still developing deeper MCS-specific templates.
Real-World Example
A residential installer in Yorkshire generating 80+ proposals per month was juggling three tools — design software, simulation software, and spreadsheets for financials. Each proposal took 3–4 hours. With SurgePV’s unified workflow, that dropped to 45 minutes per proposal. Same-day proposals instead of next-week follow-ups. Their close rate improved because in solar sales, speed wins deals.
PVsyst has had a 30-year head start. Aurora Solar has spent hundreds of millions on marketing. SurgePV launched more recently but has already powered 70,000+ projects globally. The platform was purpose-built for the workflow gaps that legacy tools leave open, particularly automated electrical engineering, which no other platform offers natively.
Further Reading
Best Solar Proposal Software (2026) — Global comparison
Aurora Solar Review — Proposal features deep-dive
Best Solar Simulation Software — Bankability comparison
Aurora Solar — Best for Enterprise Residential Proposals
Best For: Large residential solar businesses with enterprise budgets and CRM needs
Pricing: GBP 2,100–8,000+/year
Proposal Quality: Very Good
Overall Score: 79/100
Aurora Solar delivers polished, professional proposals with strong visual elements. The platform’s AI roof modelling and 3D rendering create impressive customer-facing documents that large residential solar businesses value. According to IRENA, proposals with detailed financial modelling consistently outperform basic quotes in conversion rates.
Aurora was designed for the US residential market. Its UK financial modelling is basic — it does not natively handle supplier-specific SEG tariff rates, detailed time-of-use modelling for Octopus Agile or Flux, or Enhanced Capital Allowances for commercial projects. The proposals look polished, but the numbers behind them need manual adjustment for UK-specific calculations.
Aurora also lacks SLD generation entirely. For proposals that need to include electrical documentation — increasingly expected for commercial solar projects — you will need AutoCAD on top, adding GBP 1,600+/year and 2–3 hours per project.
Did You Know?
UK homeowners typically compare 3–5 solar quotes before deciding. The proposal that shows the most accurate, personalised financial return wins the deal.
Key Strengths
- Proposal Design: Industry-leading visual quality.
- AI Roof Modelling: Fast 3D design workflow.
- CRM Integrations: Salesforce, HubSpot connectivity.
Limitations
- No SLD Generation: Requires AutoCAD (GBP 1,600+/year).
- US-Centric Financials: Basic UK tariff support.
- High Pricing: GBP 2,100–8,000+/year, tiered features require sales call.
OpenSolar — Best Free Proposal Software for UK Installers
Best For: Small UK residential installers on tight budgets
Pricing: Free
Proposal Quality: Good (Basic)
Overall Score: 70/100
OpenSolar offers a genuinely free proposal platform. For small UK residential installers who need customer-facing quotes without any software investment, it is the most accessible starting point. The proposals are clean and customer-friendly, including basic system design, energy production estimates, and financial savings projections.
OpenSolar’s UK financial modelling is basic. SEG calculations are simplified, battery storage ROI modelling is limited, and there is no support for time-of-use tariff modelling that is becoming standard as Octopus Agile and Flux adoption grows. No SLD generation means you cannot include electrical documentation. No MCS documentation support either.
Key Strengths
- Completely Free: No licensing fees.
- Easy to Learn: Cloud-based, quick onboarding.
- Customer Proposals: Clean, functional client-facing documents.
Limitations
- Basic UK Financials: Simplified SEG, no battery TOU analysis.
- No SLD: No electrical documentation capability.
- Limited Commercial: Not suited for larger commercial projects.
Pylon — Best UK-Native Proposal Platform
Best For: UK residential installers wanting a locally-built proposal tool
Pricing: Contact sales
Proposal Quality: Good
Overall Score: 72/100
Pylon (formerly Solo) is a UK-focused solar proposal platform built specifically for the British installer market. It speaks the right language: GBP pricing, pence-per-kWh rates, and UK-specific financial calculations are native, not adapted from US templates.
Pylon is a proposal and quoting tool. It does not include full 3D design, shading analysis, SLD generation, or bankable simulation. You need a separate design tool (and potentially AutoCAD for electrical documentation) alongside Pylon, adding cost and complexity.
Key Strengths
- UK-Native: Built for the British market, GBP throughout.
- Local Support: UK installer community and support team.
- Familiar Terms: UK financial terminology and conventions.
Limitations
- Proposal-Only: No design, simulation, or SLD generation.
- Requires Additional Tools: Needs separate design software alongside.
- Pricing Not Transparent: Contact sales required.
Excel and Manual Templates — The Baseline
Best For: Very small teams with minimal project volume
Pricing: Free
Proposal Quality: Poor–Basic
Overall Score: 45/100
A significant number of UK installers still create proposals manually. Manual proposals take 1–2 hours per project. They are prone to calculation errors, inconsistent formatting, and outdated financial assumptions.
Every hour spent on manual proposals is an hour not spent selling. If your team handles 20 proposals per month, that is 20–40 hours wasted — nearly a full working week. The switch to automated proposal software pays for itself within the first month for most UK installers.
Key Strengths
- Free: No software costs.
- Fully Customisable: Complete control over format.
Limitations
- Time-Consuming: 1–2 hours per proposal.
- Error-Prone: Manual calculations increase risk.
- Unprofessional: Compared to interactive software proposals.
Generate UK Solar Proposals in Minutes
See how SurgePV creates professional GBP proposals with SEG modelling, battery ROI, and integrated SLD — all from a single design.
Book a DemoNo commitment required · 20 minutes · Live project walkthrough
Why Most UK Proposal Tools Fall Short
Not all solar design software and proposal tools are built for the UK market. These five criteria separate the platforms that understand British solar economics from those that do not.
UK Financial Modelling (Weighted 30%)
The most important feature for UK proposals is financial accuracy. Your proposals need to model SEG payments at supplier-specific rates (3–15p/kWh), self-consumption savings at 24–28p/kWh (Ofgem price cap), battery storage ROI with time-of-use tariffs, and 0% VAT for residential installations.
UK Tariff Analysis (Weighted 25%)
UK electricity pricing is complex and changing rapidly: quarterly Ofgem price cap adjustments, time-of-use tariffs (Octopus Agile, Flux, Economy 7/10), standing charges at ~60p/day, and export tariffs varying from fixed-rate SEG to time-of-export and tracker tariffs. Software that models these tariff structures produces proposals customers trust.
Proposal Quality and Presentation (Weighted 20%)
UK homeowners are increasingly educated about solar. A proposal that looks like a professional energy audit — with 3D visualisation, personalised financial analysis, and clear payback timelines — closes more deals than a basic spreadsheet.
Design Integration (Weighted 15%)
Solar simulation software that connects directly to your system design eliminates data re-entry errors. SurgePV is the only platform on this list that also includes integrated SLD generation — adding electrical documentation to your proposal package without additional tools.
Pricing and Value (Weighted 10%)
For UK installers, total cost of ownership matters. Factor in not just the proposal software cost, but all the tools you need alongside it — design software, AutoCAD for SLDs, simulation tools, and CRM.
Pricing Comparison: What UK Installers Actually Pay
| Approach | Proposal Tool | Design Tool | SLD Tool | Total (GBP/yr) |
|---|---|---|---|---|
| SurgePV (all-in-one) | Included | Included | Included | ~GBP 1,199 |
| Aurora + AutoCAD | Included | Included | AutoCAD (GBP 1,600) | GBP 3,700–9,600+ |
| Pylon + Design + CAD | Pylon (TBD) | Separate tool | AutoCAD (GBP 1,600) | GBP 2,500–5,000+ |
| OpenSolar + CAD | Free | Free (basic) | AutoCAD (GBP 1,600) | GBP 0–1,600 |
| Excel (manual) | Free | Separate tool | Manual | GBP 0 (but 1–2 hrs/proposal) |
The hidden cost of manual proposals deserves attention. At 20 proposals per month and 1.5 hours each, that is 30 hours of labour. At GBP 25/hour, that is GBP 750/month — GBP 9,000/year in labour alone. SurgePV at ~GBP 1,199/year pays for itself in 6 weeks.
Important
All pricing data verified against official sources as of February 2026. Prices may have changed since publication.
Which Tool Fits Your Use Case?
| Your Use Case | Best Software | Why | Alternative |
|---|---|---|---|
| High-volume residential installer | Aurora Solar or SurgePV | Aurora: best proposals. SurgePV: proposals + engineering | Solargraf |
| C&I EPC (100+ kW) | SurgePV | Integrated design + proposals + SLDs in one tool | HelioScope + PVsyst combo |
| Storage + solar specialist | Energy Toolbase | Best financial modeling for battery + solar | SurgePV for design integration |
| Projects requiring UK lender financing | PVsyst or SurgePV | P50/P90 bankability reports accepted by lenders | HelioScope (some lenders) |
| Startup installer (<30 projects/year) | OpenSolar or SurgePV | OpenSolar: free entry. SurgePV: more features | Free tools + outsourced engineering |
Further Reading
For a broader comparison beyond this market, see our guide to the best solar design software globally.
Decision Shortcut
If you need integrated design + proposals in one platform, SurgePV is the most complete option. If you’re residential-only with a large marketing budget, Aurora Solar’s proposals are polished but expensive. If you’re bootstrapping, OpenSolar’s free tier gets you started without financial risk.
Our Testing Methodology
Our evaluation scored each platform across five criteria specific to UK proposal workflows:
- UK Financial Modelling (30%): SEG payment accuracy, self-consumption modelling, battery ROI, 0% VAT, ECA
- UK Tariff Analysis (25%): Ofgem price cap awareness, TOU tariff modelling, export optimisation
- Proposal Quality (20%): Professional presentation, GBP formatting, customer-facing delivery, interactive elements
- Design Integration (15%): Design-to-proposal workflow, SLD inclusion, data consistency
- Pricing and Value (10%): Total cost of ownership including all required tools
We tested each platform by generating proposals for three representative UK projects: a 4 kW residential with 5 kWh battery in London, a 50 kW commercial flat roof in Manchester, and a 150 kW warehouse in Bristol. We compared proposal accuracy against manual calculations verified by a chartered engineer, using IEA irradiance data as a cross-reference benchmark. Testing performed by engineers with 10+ years of UK and European solar experience across 500+ projects.
The Bottom Line
For UK installers wanting one platform that does it all: SurgePV delivers the strongest combination of design, electrical documentation, and proposals for the UK market. Your proposals include accurate SEG modelling, battery storage ROI, 0% VAT calculations, and professional GBP presentation — all generated from a single design in 15–20 minutes. The integrated SLD generation adds engineering credibility that no other proposal tool matches. At ~GBP 1,199/user/year, it replaces a multi-tool stack costing 3–8x more.
For enterprise residential teams with CRM needs: Aurora Solar offers polished proposals and strong CRM integrations, but lacks UK-specific financial depth and SLD generation.
For budget-conscious small installers: OpenSolar provides free basic proposals to get you started.
For UK-native proposal focus: Pylon speaks the UK market’s language natively but requires a separate design and SLD workflow.
For the smallest teams: Excel works, but at 1–2 hours per proposal, the labour cost alone exceeds SurgePV’s annual subscription within 6 weeks.
The UK solar market is not slowing down. The installers winning deals today are the ones with professional proposals and accurate financials on the customer’s table same-day. Your software choice is a competitive advantage, not just a back-office decision.
Ready to see the difference? Book a demo — our team will generate a complete UK proposal using your actual project data. Or see pricing — transparent, no sales call required.
Related Guides
Best All-in-One Solar Design Software — Complete platform comparison
OpenSolar Review — Free proposal tool deep-dive
Best Solar Simulation Software — Bankability comparison
When You May Not Need Solar Proposal Software
Purpose-built proposal software is not the right fit for every UK solar business.
Very small installers (fewer than 5 proposals monthly): If you’re a sole trader handling only occasional domestic installations, the GBP 1,100–2,400 annual cost of professional software may outweigh the time-saving benefits. At this low volume, Excel templates can be economically justifiable.
Sales organisations outsourcing all technical work: If your business model is purely lead generation and sales, with all design, engineering, and installation work subcontracted, integrated design-to-proposal platforms may be unnecessary.
Large EPCs with custom internal systems: Some established UK solar companies have invested in proprietary software that already handles SEG calculations, battery ROI modelling, and proposal generation. If your internal tools are working efficiently and actively maintained, migrating may not provide meaningful advantages.
Projects with highly standardised specifications: If you focus exclusively on identical, repeatable installations with no customisation or battery storage, and compete primarily on price rather than proposal sophistication, basic spreadsheet workflows may still be adequate.
The Tipping Point
Most UK installers find that proposal software pays for itself at 8–12 proposals per month. Below that threshold, manual workflows are inefficient but tolerable. Above it, professional automation becomes essential for competitive speed and accuracy.
Frequently Asked Questions
What is the best solar proposal software in the UK?
SurgePV is the best solar proposal software for the UK in 2026. It combines design, SLD generation, and proposals with UK financial modelling — SEG payments, self-consumption savings, battery ROI, 0% VAT — in one platform at ~GBP 1,199/user/year. For free alternatives, OpenSolar provides basic proposals without licensing fees.
Can proposal software calculate Smart Export Guarantee income?
Yes. SurgePV models SEG payment projections at supplier-specific rates (3–15p/kWh), showing annual export income and optimising self-consumption vs export based on system size, load profile, and battery capacity.
Which software handles UK battery storage proposals?
SurgePV and Aurora Solar both model battery storage ROI for UK systems. SurgePV includes self-consumption increase, time-of-use tariff arbitrage (Octopus Agile, Flux), and grid services income modelling. With 60%+ of UK residential installs including batteries, accurate storage modelling is non-negotiable for winning proposals.
How much does solar proposal software cost in the UK?
Ranges from free (OpenSolar) to GBP 8,000+/year (Aurora Solar enterprise). SurgePV: ~GBP 1,199/user/year (design + proposals + SLD). Aurora Solar: GBP 2,100–8,000+/year. OpenSolar: Free. Check our pricing page for current rates.
Does proposal software account for 0% VAT on solar?
Yes. SurgePV and UK-aware platforms apply 0% VAT for residential solar installations (since April 2022, extended to March 2027), showing accurate post-VAT pricing in customer proposals.
What should a UK solar proposal include?
A UK solar proposal must include: system design with panel layout, annual energy production (kWh), self-consumption savings (24–28p/kWh avoided), SEG export income (3–15p/kWh), battery storage analysis (if applicable), payback period, equipment specifications (MCS-approved products), warranties, and financing options. SurgePV generates all of these from a single design.
How fast can you generate a solar proposal in the UK?
With SurgePV, proposals take 15–20 minutes from design completion. Manual Excel workflows take 1–2 hours. Aurora Solar takes 20–30 minutes but lacks UK-specific financial depth. Speed matters in the UK market — the installer who delivers the first professional proposal typically sees a 25–40% better conversion rate.
Which proposal software supports MCS-certified installations?
SurgePV generates design documentation applicable to MCS requirements, including IEC-compliant SLDs and technical specifications. MCS certification depends on installer credentials and documentation practices, not software alone.
Sources
- Ofgem — Smart Export Guarantee scheme details. https://www.ofgem.gov.uk/environmental-and-social-schemes/smart-export-guarantee-seg (accessed February 2026)
- Ofgem — Energy price cap information. https://www.ofgem.gov.uk/check-if-energy-price-cap-affects-you (accessed February 2026)
- MCS Certified — Microgeneration Certification Scheme. https://mcscertified.com/ (accessed February 2026)
- Solar Energy UK — Industry statistics and market data. https://solarenergyuk.org/ (accessed February 2026)
- HMRC — VAT on energy-saving materials. https://www.gov.uk/guidance/vat-on-energy-saving-materials (accessed February 2026)
- IET — BS 7671 Wiring Regulations. https://www.theiet.org/standards/bs-7671/ (accessed February 2026)
- Aurora Solar — Official pricing. https://aurorasolar.com/pricing/ (accessed February 2026)
- OpenSolar — Official platform. https://www.opensolar.com/ (accessed February 2026)