Astrawatt Solar
Vertically integrated Atlanta solar installer since 2016, Tesla Powerwall and Enphase Platinum Certified with A+ BBB rating
10+
Years in Business
50
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About Astrawatt Solar
Astrawatt Solar is a vertically integrated solar installation company headquartered at 3350 Riverwood Parkway, Suite 1900, in Atlanta, Georgia. Founded in 2016 by Keith Murphy, the company manages all aspects of solar panel installation in-house, from sales and design through engineering, permitting, installation, and post-installation service. Astrawatt is a Tesla Powerwall Certified Installer and Enphase Platinum Installer, with an A+ BBB rating.
The company installs REC solar panels with exclusive extended warranties, paired with Enphase microinverters and Tesla Powerwall or Enphase battery storage systems. Astrawatt uses Tier 1 solar panels and maintains a dedicated service team to handle technical support and warranty claims. The company’s vertically integrated model means homeowners deal with a single company throughout the entire process, avoiding the handoffs that can occur with companies that subcontract installation work.
Astrawatt Solar serves the greater Atlanta metro area including Marietta, Roswell, Alpharetta, Decatur, Lawrenceville, Peachtree City, and Smyrna. The company also operates in other markets across the Southeast. Astrawatt’s Atlanta office at Riverwood Parkway provides local support for Georgia homeowners considering solar.
Service Area
Astrawatt Solar serves the following areas within a 62-mile radius:
Contact Information
Are you Astrawatt Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
50 reviews
Brandon H.
Astrawatt handled everything in-house, from the initial design to the final inspection. The REC panels and Tesla Powerwall are working great. Our electricity bill dropped by 85% in the first full month.
Megan S.
We compared several Atlanta solar companies and Astrawatt offered the best combination of quality equipment and responsive service. The Enphase monitoring app makes it easy to track our production.
Richard A.
Good experience overall. The sales team was knowledgeable and not pushy. Installation took two days for our 12 kW system. The Tesla Powerwall has already proven its worth during a power outage.
Frequently Asked Questions About Astrawatt Solar
What services does Astrawatt Solar offer?
Astrawatt Solar offers Solar Installation, Battery Storage, Solar Design, Roof Assessment, Grid Connection, Maintenance, Monitoring.
Is Astrawatt Solar NABCEP certified?
Astrawatt Solar holds the following certifications: Tesla Powerwall Certified, Enphase Platinum Installer, BBB Accredited. Contact them directly for the latest accreditation details.
What areas does Astrawatt Solar serve?
Astrawatt Solar serves Atlanta, Marietta, Roswell, Alpharetta, Decatur, Lawrenceville, Peachtree City, Smyrna. They are based in Atlanta with a service radius of 100 km.
What warranty does Astrawatt Solar offer?
Astrawatt Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Astrawatt Solar's customer reviews?
Astrawatt Solar has a 4.8/5 rating based on 50 customer reviews. Customers consistently rate them highly.
How long has Astrawatt Solar been in business?
Astrawatt Solar was founded in 2016 and has been in business for 10 years. They are one of the more experienced solar installers in their area.
Similar Installers in Atlanta
Get a Free Solar Quote from Astrawatt Solar
Fill in your details and we'll connect you with Astrawatt Solar.
Quote request sent!
Astrawatt Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile