Solar Plus
NABCEP-certified Atlanta solar installer since 2016, led by owner-operator Don Tonic with hands-on crew leadership on every project
10+
Years in Business
37
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About Solar Plus
Solar Plus is a solar installation and consulting company headquartered at 715 Peachtree Street NE, Suite 100, in Atlanta, Georgia. Founded in 2016 by Don Tonic, a NABCEP Certified PV Installation Professional and licensed electrical contractor with over eight years of field experience, the company serves residential and commercial customers across Atlanta, Charlotte, Greenville, and Columbia. Every Solar Plus installation crew is led by a NABCEP-certified professional, and Don personally directs all projects.
The company installs Canadian Solar panels and handles the complete installation process from design through permitting, installation, and inspection. Solar Plus is OSHA-certified and maintains high safety standards on every job site. The company’s owner-operator model ensures consistent quality, with Don Tonic actively involved in the hiring, training, and retention of installation professionals.
Solar Plus serves the greater Atlanta area including Decatur, Midtown, Buckhead, and East Atlanta, as well as markets in the Carolinas. With 37 reviews on Yelp and a 4.9-star average, the company has earned a reputation for meticulous workmanship and responsive customer service. Business hours are Monday through Friday, 9 AM to 6 PM.
Service Area
Solar Plus serves the following areas within a 62-mile radius:
Contact Information
Are you Solar Plus?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
37 reviews
Anthony G.
Don personally led our installation crew and the quality was outstanding. Every cable was neatly routed and every panel was perfectly aligned. You can tell this team takes pride in their work.
Jessica L.
Solar Plus installed a 9 kW system on our midtown Atlanta home. The process was straightforward and the crew was professional. Our energy bills have been cut by more than half.
Ryan P.
Highly recommend Solar Plus. Don is a NABCEP-certified installer who clearly knows his craft. The system was designed to maximize production on our east-west facing roof. Performing above expectations.
Frequently Asked Questions About Solar Plus
What services does Solar Plus offer?
Solar Plus offers Solar Installation, Battery Storage, Solar Design, Roof Assessment, Grid Connection, Maintenance.
Is Solar Plus NABCEP certified?
Solar Plus holds the following certifications: NABCEP Certified PV Installation Professional, OSHA Certified, Licensed Electrical Contractor. Contact them directly for the latest accreditation details.
What areas does Solar Plus serve?
Solar Plus serves Atlanta, Decatur, Midtown, Buckhead, East Atlanta, Charlotte, Greenville, Columbia. They are based in Atlanta with a service radius of 100 km.
What warranty does Solar Plus offer?
Solar Plus offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Solar Plus's customer reviews?
Solar Plus has a 4.9/5 rating based on 37 customer reviews. Customers consistently rate them highly.
How long has Solar Plus been in business?
Solar Plus was founded in 2016 and has been in business for 10 years. They are one of the more experienced solar installers in their area.
Similar Installers in Atlanta
Get a Free Solar Quote from Solar Plus
Fill in your details and we'll connect you with Solar Plus.
Quote request sent!
Solar Plus will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile