Custom Solar Solutions
EnergySage Installer of the Year for Georgia, NABCEP-accredited family-owned solar company in Sandy Springs with 100% in-house crews
4+
Years in Business
3,000+
Projects Completed
45
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About Custom Solar Solutions
Custom Solar Solutions is a family-owned solar design and installation company based at 8601 Dunwoody Place, Suite 302, in Sandy Springs, Georgia. Voted EnergySage Installer of the Year for Georgia, the company has completed over 3,000 solar designs and installations since its founding in 2022. Custom Solar Solutions maintains a 100% in-house team of NABCEP-certified and state-licensed professionals, with no subcontracting on any project.
The company installs Qcells panels, many of which are manufactured at the Qcells factory in Dalton, Georgia, making them a locally sourced option. Inverter options include Enphase and Sol-Ark, with battery storage from Generac and Homegrid. Custom Solar Solutions holds NABCEP accreditation, REC Pro Trust certification, and Sol-Ark Platinum Installer status. The company maintains an A+ BBB rating and a perfect 5.0-star rating on EnergySage from 45 reviews.
Custom Solar Solutions serves the greater Atlanta metro including Sandy Springs, Dunwoody, Roswell, Marietta, Alpharetta, Decatur, and Buckhead. The company also offers system repair services for existing solar installations regardless of the original installer. Operating hours are Monday through Friday 9 AM to 7:30 PM, with Saturday availability from 10 AM to 2 PM.
Service Area
Custom Solar Solutions serves the following areas within a 50-mile radius:
Contact Information
Are you Custom Solar Solutions?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
5
45 reviews
William T.
Custom Solar Solutions designed and installed our system in under three weeks. The NABCEP-certified crew was professional and the Qcells panels from Georgia's own factory are producing above estimates.
Natalie B.
We interviewed four Atlanta solar companies and Custom Solar stood out. They are family-owned, every crew member is in-house, and their pricing was transparent. No hidden fees, no pressure.
Eric D.
Outstanding experience from consultation to final inspection. The team explained every component and helped us choose the right battery backup for our needs. System has been flawless.
Frequently Asked Questions About Custom Solar Solutions
What services does Custom Solar Solutions offer?
Custom Solar Solutions offers Solar Installation, Battery Storage, Solar Design, Roof Assessment, Maintenance.
Is Custom Solar Solutions NABCEP certified?
Custom Solar Solutions holds the following certifications: NABCEP Accredited, REC Pro Trust, Sol-Ark Platinum Installer, BBB Accredited. Contact them directly for the latest accreditation details.
What areas does Custom Solar Solutions serve?
Custom Solar Solutions serves Atlanta, Sandy Springs, Dunwoody, Roswell, Marietta, Alpharetta, Decatur, Buckhead. They are based in Atlanta with a service radius of 80 km.
What warranty does Custom Solar Solutions offer?
Custom Solar Solutions offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Custom Solar Solutions's customer reviews?
Custom Solar Solutions has a 5/5 rating based on 45 customer reviews. Customers consistently rate them highly.
How long has Custom Solar Solutions been in business?
Custom Solar Solutions was founded in 2022 and has been in business for 4 years. They are a newer entrant in the solar installation market.
Similar Installers in Atlanta
Get a Free Solar Quote from Custom Solar Solutions
Fill in your details and we'll connect you with Custom Solar Solutions.
Quote request sent!
Custom Solar Solutions will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile