Solar Installers in Georgia
Compare top-rated solar companies across Georgia. Read verified reviews, check certifications, and request free quotes from local installers.
Find Solar Installers by City
Browse 2 cities in Georgia. Select a city to see local installers.
All Solar Installers in Georgia
20 solar companies across Georgia
Custom Solar Solutions
VerifiedNABCEP Accredited · REC Pro Trust · Sol-Ark Platinum Installer · BBB Accredited
Qcells + Enphase
South Shore Roofing
VerifiedBBB Accredited
Solar Plus
VerifiedNABCEP Certified PV Installation Professional · OSHA Certified · Licensed Electrical Contractor
Canadian Solar
Astrawatt Solar
VerifiedTesla Powerwall Certified · Enphase Platinum Installer · BBB Accredited
REC + Enphase
Better Tomorrow Solar
VerifiedSEIA Member · SEPA Member · BBB Accredited
Sun Peach Solar
VerifiedBBB Accredited
Old Coast Heating & Air Conditioning
VerifiedBBB Accredited · ENERGY STAR Certified
Velo Solar
VerifiedLicensed Professional Engineer · BBB Accredited
Suncatcher of Atlanta
VerifiedBBB Accredited
Qcells + Enphase
Savannah Roofs
Creative Solar USA
VerifiedNABCEP Certified PV Installation Professional · NABCEP Certified Technical Sales Professional · SEIA Member · GSEA Member
Elek Solar
VerifiedSEIA Member
Hannah Solar
VerifiedNABCEP · Licensed Master Electricians (GA, AL, MS, NC, SC, TN)
Coastal Roofworks
VerifiedBBB A- Rating
Coastal Solar Power
VerifiedGeorgia Grown Member
LowCo Roofing and Exteriors
VerifiedSavannah Chamber of Commerce Member
Lucent Energy
Tesla
Merica Solar Panels
Savannah Solar Power
Alpha Omega Construction Group
VerifiedOwens Corning Certified
How We Rank Solar Installers
Our rankings combine verified customer reviews, certification status, years of experience, service range, and warranty coverage into a single SurgePV Score.
Customer Reviews
We aggregate ratings from Google, Yelp, BBB, and SolarReviews. Only companies with strong track records are listed.
Certifications
NABCEP certification is the US gold standard. We also check for state licensing, BBB accreditation, and manufacturer certifications.
Track Record
Years in business, projects completed, warranty coverage, and service range contribute to the overall score.
Why Trust the SurgePV Directory?
Every company listed here has been independently researched and verified. We check certifications against official registers, aggregate reviews from multiple platforms, and verify that every business is actively trading. Companies cannot pay to improve their ranking.
20
Verified Companies
1,250
Customer Reviews
Design Faster. Sell More.
SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.
60%
Faster project design
10 min
Full design turnaround
Frequently Asked Questions
How much do solar panels cost in Georgia?
Solar panel costs in Georgia typically range from $2.50-$3.50 per watt. A standard 8kW residential system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so this is the full out-of-pocket cost. State and local incentives, net metering, and SRECs may help reduce your net cost.
What certifications should I look for?
NABCEP (North American Board of Certified Energy Practitioners) certification is the gold standard. At minimum, your installer should hold the required Georgia state contractor license, carry liability insurance and workers' compensation, and have manufacturer certifications for the equipment they install.
What solar incentives are available in Georgia?
The 30% federal residential solar tax credit expired on December 31, 2025. Homeowners in Georgia can no longer claim this federal credit for new installations. State-level incentives may still be available, including state tax credits, rebates, property tax exemptions, sales tax exemptions, net metering, and SRECs. Commercial projects may still qualify for the federal ITC under transition rules. Check with your installer or visit the DSIRE database for current Georgia-specific incentives.
Are You a Solar Installer in Georgia?
List your company for free and connect with local customers looking for solar installation services.
List Your Company Free