Astrawatt Solar
Third fastest-growing solar company in the US with 4.9-star Google rating serving Greater Houston
10+
Years in Business
20
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About Astrawatt Solar
Astrawatt Solar is a residential solar installation company with Houston-area offices at 18484 Clay Rd, Suite A300, Houston, TX 77084 and 319 Ibis St, Suite A, Webster, TX 77598. Founded in 2016, the company has grown to become one of the fastest-growing solar companies in the United States, ranking third nationally. Astrawatt currently operates in the Houston, Texas and Kansas City, Missouri markets.
The company specializes in residential solar panel installations with products from REC (panels), Enphase (inverters), and Tesla (Powerwall batteries). Astrawatt handles the entire process from system design through installation, permitting, and utility interconnection, with most installations completed in one to three days.
Astrawatt Solar holds a 4.9-star Google rating with 20 reviews and a 5.0-star rating on Birdeye. The company maintains positive customer feedback across multiple review platforms, with customers praising the streamlined installation process and responsive customer service team.
Service Area
Astrawatt Solar serves the following areas within a 50-mile radius:
Contact Information
Are you Astrawatt Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
20 reviews
Verified Customer
Astrawatt made the entire solar process simple and straightforward. The team was responsive and the installation was completed in just two days.
Verified Customer
Excellent experience from consultation to installation. The crew was professional and efficient. Our energy production has exceeded the initial estimates.
Verified Customer
Good installation and quality equipment. The only minor issue was some delays in permitting, but Astrawatt kept us updated throughout the process.
Frequently Asked Questions About Astrawatt Solar
What services does Astrawatt Solar offer?
Astrawatt Solar offers Solar Installation, Battery Storage.
Is Astrawatt Solar NABCEP certified?
Astrawatt Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Astrawatt Solar serve?
Astrawatt Solar serves Houston, Katy, Sugar Land, Webster, Pearland, League City. They are based in Houston with a service radius of 80 km.
What warranty does Astrawatt Solar offer?
Astrawatt Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Astrawatt Solar's customer reviews?
Astrawatt Solar has a 4.9/5 rating based on 20 customer reviews. Customers consistently rate them highly.
How long has Astrawatt Solar been in business?
Astrawatt Solar was founded in 2016 and has been in business for 10 years. They are one of the more experienced solar installers in their area.
Similar Installers in Houston
Get a Free Solar Quote from Astrawatt Solar
Fill in your details and we'll connect you with Astrawatt Solar.
Quote request sent!
Astrawatt Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile