SolRa Tech
Houston-based multi-division contractor with 5-star Google rating from over 400 reviews
2026+
Years in Business
400
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About SolRa Tech
SolRa Tech is a Houston-based multi-division contractor headquartered at 555 W 19th St, Suite 326, Houston, TX 77008. The company specializes in solar energy installations alongside roofing, HVAC, and remodeling services, serving residential and commercial customers across the Greater Houston area. SolRa Tech has expanded operations to Florida and California.
The company offers customized solar panel systems designed to match each home’s specific layout and energy needs. SolRa Tech provides financing options with zero down payment and handles all aspects of the installation process from design through activation.
SolRa Tech holds the highest Google review rating among smaller Houston solar installers, with a 5.0-star rating from over 400 reviews. Customers consistently praise the professional installation crews, responsive communication, and quality workmanship across all service divisions.
Service Area
SolRa Tech serves the following areas within a 50-mile radius:
Contact Information
Are you SolRa Tech?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
5
400 reviews
Verified Customer
SolRa Tech delivered an outstanding solar installation. The team was professional, efficient, and thorough in explaining every step of the process.
Verified Customer
Excellent experience from start to finish. The crew was courteous and completed the installation ahead of schedule. Our energy bills have been cut in half.
Verified Customer
Kenneth and his team were fantastic. They designed a custom system that fits our roof perfectly. Zero issues since installation and great monitoring setup.
Frequently Asked Questions About SolRa Tech
What services does SolRa Tech offer?
SolRa Tech offers Solar Installation, Battery Storage.
Is SolRa Tech NABCEP certified?
SolRa Tech holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does SolRa Tech serve?
SolRa Tech serves Houston, Katy, Sugar Land, The Woodlands, Pearland, Cypress. They are based in Houston with a service radius of 80 km.
What warranty does SolRa Tech offer?
SolRa Tech offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are SolRa Tech's customer reviews?
SolRa Tech has a 5/5 rating based on 400 customer reviews. Customers consistently rate them highly.
How long has SolRa Tech been in business?
SolRa Tech was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Houston
Get a Free Solar Quote from SolRa Tech
Fill in your details and we'll connect you with SolRa Tech.
Quote request sent!
SolRa Tech will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile