BT

Better Tomorrow Solar

Atlanta's only woman-owned solar company, founded in 2018, with A+ BBB rating and residential and commercial installations across metro Atlanta

Atlanta, Georgia
4.8 (30 reviews)
Verified
Residential Commercial

8+

Years in Business

0

30

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

9 / 10
Customer Reviews
96%
Certifications
90%
Experience
85%
Services Range
100%
Warranty Coverage
63%
Online Presence
100%

About Better Tomorrow Solar

Better Tomorrow Solar is a residential and commercial solar installation company based at 1074 Memorial Drive SE in Atlanta, Georgia. Founded in 2018 by co-founders Roji and Kaveh, the company is the only woman-owned and operated solar company in Atlanta. Better Tomorrow Solar holds an A+ BBB rating and is a member of the Solar Energy Industries Association (SEIA) and the Smart Electric Power Alliance (SEPA).

The company provides full-service solar installations including system design, permitting, installation, and post-installation monitoring. Better Tomorrow Solar serves both residential and commercial customers across the Atlanta metro area, helping property owners reduce their electricity costs and carbon footprint. The company’s team handles every step in-house, from initial energy assessment through utility interconnection.

Better Tomorrow Solar is headquartered in the Memorial Drive corridor of Atlanta and serves neighborhoods and communities throughout metro Atlanta including Decatur, East Atlanta, Kirkwood, Grant Park, Tucker, Stone Mountain, and Brookhaven. The company operates Monday through Friday from 9 AM to 5 PM and offers free consultations for homeowners considering solar.

Service Area

Better Tomorrow Solar serves the following areas within a 50-mile radius:

AtlantaDecaturEast AtlantaKirkwoodGrant ParkTuckerStone MountainBrookhaven

Are you Better Tomorrow Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Roof Assessment
Energy Audit
Grid Connection
Maintenance

Certifications & Accreditations

SEIA Member SEPA Member BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

30 reviews

Angela M.

5 October 2025
Verified Customer

Better Tomorrow Solar made the entire process easy and stress-free. The team was transparent about costs and timelines, and our system was installed on schedule. Happy to support a local, woman-owned business.

Jason R.

22 July 2025
Verified Customer

We got three quotes in Atlanta and Better Tomorrow Solar offered the best value with clear explanations of every line item. Installation was clean and the crew was respectful of our property.

Stephanie W.

18 April 2025
Verified Customer

Good experience with Better Tomorrow Solar. They helped us understand our energy usage and designed a system that covers most of our needs. The battery backup was a great addition for storm season.

Frequently Asked Questions About Better Tomorrow Solar

What services does Better Tomorrow Solar offer?

Better Tomorrow Solar offers Solar Installation, Battery Storage, Solar Design, Roof Assessment, Energy Audit, Grid Connection, Maintenance.

Is Better Tomorrow Solar NABCEP certified?

Better Tomorrow Solar holds the following certifications: SEIA Member, SEPA Member, BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Better Tomorrow Solar serve?

Better Tomorrow Solar serves Atlanta, Decatur, East Atlanta, Kirkwood, Grant Park, Tucker, Stone Mountain, Brookhaven. They are based in Atlanta with a service radius of 80 km.

What warranty does Better Tomorrow Solar offer?

Better Tomorrow Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Better Tomorrow Solar's customer reviews?

Better Tomorrow Solar has a 4.8/5 rating based on 30 customer reviews. Customers consistently rate them highly.

How long has Better Tomorrow Solar been in business?

Better Tomorrow Solar was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Better Tomorrow Solar

Fill in your details and we'll connect you with Better Tomorrow Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote