CM Ward
Award-winning electrical and renewable energy contractor, MCS and RECC accredited, serving Derby and the East Midlands since 2020
6+
Years in Business
60 km
Service Area
11-50
Employees
SurgePV Score
About CM Ward
CM Ward Ltd is an electrical contracting and renewable energy company incorporated in May 2020, based at Unit 1 Meadow Court, Moreland Street, Nottingham, NG2 3GS. The company serves Derby, Nottingham, Leicester, Northampton, Chesterfield, Sheffield and Lincoln, providing solar PV, battery storage and EV charging point installations for domestic and commercial customers.
The company holds MCS (Microgeneration Certification Scheme) accreditation and RECC (Renewable Energy Consumer Code) membership, ensuring installations qualify customers for the Smart Export Guarantee and are covered by independent consumer protection. CM Ward is described as an award-winning electrical contractor delivering turnkey renewable energy solutions.
Their team of dedicated electricians and solar panel installers are fully trained and certified, with installations carried out to MCS standards from initial survey and system design through to commissioning. The company’s electrical contracting background informs their solar work, particularly on commercial sites and properties requiring careful integration with existing electrical infrastructure.
CM Ward Ltd can be contacted by phone on 0115 697 6003, by email at [email protected], or through the contact form at cmwardltd.co.uk.
Service Area
CM Ward serves the following areas within a 60 km radius:
Contact Information
Are you CM Ward?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
No reviews yet.
Frequently Asked Questions About CM Ward
What services does CM Ward offer?
CM Ward offers Solar Installation, Battery Storage, EV Charging.
Is CM Ward MCS certified?
Yes, CM Ward is MCS certified and also holds RECC certification. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does CM Ward serve?
CM Ward serves Derby, Nottingham, Leicester, Northampton, Chesterfield, Sheffield, Lincoln. They are based in Derby with a service radius of 60 km.
What warranty does CM Ward offer?
CM Ward offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are CM Ward's customer reviews?
CM Ward does not have any reviews yet. Be the first to leave a review after using their services.
How long has CM Ward been in business?
CM Ward was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.
Similar Installers in Derby
Get a Free Solar Quote from CM Ward
Fill in your details and we'll connect you with CM Ward.
Quote request sent!
CM Ward will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile