GG

Geo Green Power

One of the UK's leading renewable energy installers with 5-star Trustpilot rating and over 169 verified reviews

Derby, UK
5 (169 reviews)
Verified
Residential Commercial

16+

Years in Business

0

169

Customer Reviews

60 km

Service Area

51-200

Employees

SurgePV Score

8.2 / 10
Customer Reviews
100%
Certifications
60%
Experience
100%
Services Range
90%
Warranty Coverage
63%
Online Presence
50%

About Geo Green Power

Geo Green Power is a renewable energy installer based at Bradmore Business Park, Loughborough Road, Bunny, Nottingham NG11 6QA, serving Derby and the wider East Midlands region. Founded in 2010, the company has grown into one of the UK’s most active solar and renewables businesses, completing between 1.5 MW and 2 MW of solar PV installations every month for clients ranging from private homes to major corporate accounts including Smeg, Mercedes-Benz, JCB and Kingspan.

The company holds MCS certification and offers solar PV, battery storage, EV charging and heat pump installations across residential and commercial sectors. Their Derby service area covers the city and surrounding Derbyshire towns.

Geo Green Power has earned a 5-star rating on Trustpilot from over 169 customer reviews. Customers consistently highlight the technical knowledge of engineers, clear communication throughout the project, and the quality of post-installation support. The company can be reached on 0800 988 3188 or via email at [email protected].

Service Area

Geo Green Power serves the following areas within a 60 km radius:

DerbyNottinghamLeicesterChesterfieldBurton upon TrentLoughborough

Are you Geo Green Power?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance

Certifications & Accreditations

MCS

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

5

169 reviews

Verified Customer

12 October 2025
Verified Customer

GeoGreen provide the very highest level of expertise and professionalism. Their expert engineers are truly professional and go that extra mile.

Verified Customer

22 August 2025
Verified Customer

Great communication from start to finish. The process was smooth, professional, and hassle-free. Everything was handled efficiently.

Frequently Asked Questions About Geo Green Power

What services does Geo Green Power offer?

Geo Green Power offers Solar Installation, Battery Storage, EV Charging, Maintenance.

Is Geo Green Power MCS certified?

Yes, Geo Green Power is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Geo Green Power serve?

Geo Green Power serves Derby, Nottingham, Leicester, Chesterfield, Burton upon Trent, Loughborough. They are based in Derby with a service radius of 60 km.

What warranty does Geo Green Power offer?

Geo Green Power offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Geo Green Power's customer reviews?

Geo Green Power has a 5/5 rating based on 169 customer reviews. Customers consistently rate them highly.

How long has Geo Green Power been in business?

Geo Green Power was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Geo Green Power

Fill in your details and we'll connect you with Geo Green Power.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote