Eco Switch Improvements
Family-run Derby solar specialist with 5-star Trustpilot rating, MCS, NICEIC, RECC, TrustMark and CTSI accreditations
2026+
Years in Business
37
Customer Reviews
50 km
Service Area
1-10
Employees
SurgePV Score
About Eco Switch Improvements
Eco Switch Improvements is a family-run solar PV specialist based at 55 Deans Drive, Borrowash, Derbyshire, DE72 3HQ. The company designs and installs fully bespoke solar panel systems tailored to each customer’s energy usage and roof configuration, serving Derby and the wider East Midlands.
Eco Switch holds an extensive set of accreditations: MCS and NICEIC for solar PV and battery storage installations, RECC (Renewable Energy Consumer Code), TrustMark (government-endorsed quality scheme) and CTSI (Chartered Trading Standards Institute) Quality Mark. This combination of certifications reflects the company’s commitment to both technical quality and consumer protection.
The company has earned a 5-star rating on Trustpilot from 37 verified customer reviews. Feedback consistently highlights the quality of technical advice at the survey stage, neat and professional workmanship, and responsive after-sales communication. Customers note that Eco Switch engineers design systems to meet actual needs rather than pushing oversized installations.
Services include residential and commercial solar panel installation and battery storage. Contact Eco Switch Improvements by phone on 07557 901033 or through the enquiry form at ecoswitchimprovements.co.uk.
Service Area
Eco Switch Improvements serves the following areas within a 50 km radius:
Contact Information
Are you Eco Switch Improvements?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
5
37 reviews
Verified Customer
The level of service has been exceptional, from initial site visit through to and beyond installation. The level of product knowledge and quality of advice given was first rate, the system designed to our specific needs.
Verified Customer
The installation was excellent, staff were very professional, tidy, friendly and approachable. Communication was first rate and support and advice has been a text or call away.
Frequently Asked Questions About Eco Switch Improvements
What services does Eco Switch Improvements offer?
Eco Switch Improvements offers Solar Installation, Battery Storage.
Is Eco Switch Improvements MCS certified?
Yes, Eco Switch Improvements is MCS certified and also holds TrustMark, RECC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Eco Switch Improvements serve?
Eco Switch Improvements serves Derby, Borrowash, Nottingham, Leicester, Chesterfield, Burton upon Trent. They are based in Derby with a service radius of 50 km.
What warranty does Eco Switch Improvements offer?
Eco Switch Improvements offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Eco Switch Improvements's customer reviews?
Eco Switch Improvements has a 5/5 rating based on 37 customer reviews. Customers consistently rate them highly.
How long has Eco Switch Improvements been in business?
Eco Switch Improvements was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Derby
Get a Free Solar Quote from Eco Switch Improvements
Fill in your details and we'll connect you with Eco Switch Improvements.
Quote request sent!
Eco Switch Improvements will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile