Ipsum Renewables
MCS-accredited renewables specialist with 5-star Trustpilot rating and Which Trusted Trader status, serving Derby since 2017
9+
Years in Business
142
Customer Reviews
60 km
Service Area
11-50
Employees
SurgePV Score
About Ipsum Renewables
Ipsum Renewables Ltd is a Nottinghamshire-based renewable energy specialist founded in 2017, with offices at 140 Chesterfield Road North, Mansfield, NG19 7JD and a secondary location at Unit 18, Beacon Court, Newark, NG22 9QL. The company designs and installs solar PV systems, battery storage and other renewable technologies for homes and businesses across Derby, Nottingham, Lincoln and South Yorkshire.
Ipsum Renewables holds accreditations from MCS, NAPIT, RECC, CHAS (Contractors Health and Safety Assessment Scheme) and Gas Safe, and has earned Which? Trusted Trader status. This combination of independent certifications gives customers confidence in both the technical quality of installations and the company’s financial and consumer protection standards.
The company has built a strong customer record since 2017, earning a 5-star rating on Trustpilot from 142 verified reviews. Customers highlight the thoroughness of the pre-installation survey process, the professionalism of installation teams and the competitive pricing.
Ipsum Renewables can be reached by phone on 0800 086 2894, by email at [email protected] or through the contact form at ipsumrenewables.co.uk.
Service Area
Ipsum Renewables serves the following areas within a 60 km radius:
Contact Information
Are you Ipsum Renewables?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
5
142 reviews
Verified Customer
Everything was installed as promised. They were very respectful of the property and clean. The initial survey and quotes were carried out with considerable thought about my requirements, and the pricing was competitive.
Verified Customer
They completed a full survey, including measuring the roof and inspecting the loft and garage. Very thorough from start to finish, and the installation team were professional throughout.
Frequently Asked Questions About Ipsum Renewables
What services does Ipsum Renewables offer?
Ipsum Renewables offers Solar Installation, Battery Storage, Maintenance.
Is Ipsum Renewables MCS certified?
Yes, Ipsum Renewables is MCS certified and also holds RECC certification. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Ipsum Renewables serve?
Ipsum Renewables serves Derby, Nottingham, Mansfield, Newark, Lincoln, Chesterfield, Sheffield. They are based in Derby with a service radius of 60 km.
What warranty does Ipsum Renewables offer?
Ipsum Renewables offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Ipsum Renewables's customer reviews?
Ipsum Renewables has a 5/5 rating based on 142 customer reviews. Customers consistently rate them highly.
How long has Ipsum Renewables been in business?
Ipsum Renewables was founded in 2017 and has been in business for 9 years. They have solid experience in the solar industry.
Similar Installers in Derby
Get a Free Solar Quote from Ipsum Renewables
Fill in your details and we'll connect you with Ipsum Renewables.
Quote request sent!
Ipsum Renewables will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile