Coastal Solar Power
Georgia-based solar installer serving Savannah and the coastal region with residential, commercial, and agricultural solar systems since 2011
15+
Years in Business
20
Customer Reviews
75 mi
Service Area
11-50
Employees
SurgePV Score
About Coastal Solar Power
Coastal Solar Power LLC is a solar installation company headquartered at 229 West General Screven Way, Suite N1 in Hinesville, Georgia, with satellite offices serving the greater Savannah and coastal Georgia region. Founded in 2011, the company provides solar systems for residential, commercial, and agricultural customers, with particular expertise in the poultry farming industry. Coastal Solar Power is a Georgia Grown member and has both national and international reach from its coastal Georgia base.
The company handles the full solar project lifecycle from consultation and system design through permitting, installation, and ongoing monitoring and maintenance. Coastal Solar Power has completed projects in Savannah and across the coastal Georgia region, working with homeowners, commercial building owners, and agricultural operations to design systems that maximize energy production.
Coastal Solar Power serves Savannah, Hinesville, Pooler, Richmond Hill, Statesboro, Vidalia, and communities across southeastern Georgia.
Service Area
Coastal Solar Power serves the following areas within a 75-mile radius:
Contact Information
Are you Coastal Solar Power?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
20 reviews
Travis B.
Coastal Solar installed a system on our farm and the experience was excellent. They understand the agricultural solar market well and designed a system that fits our needs perfectly.
Michelle K.
We had Coastal Solar install panels on our home in Savannah. The team was professional and the system has been producing great results since activation.
Roger D.
Good company with solid experience in the coastal Georgia region. The installation went smoothly and they handled all the permitting. Our commercial building is now producing a significant portion of its own energy.
Frequently Asked Questions About Coastal Solar Power
What services does Coastal Solar Power offer?
Coastal Solar Power offers Solar Installation, Solar Design, Battery Storage, Maintenance, Monitoring.
Is Coastal Solar Power NABCEP certified?
Coastal Solar Power holds the following certifications: Georgia Grown Member. Contact them directly for the latest accreditation details.
What areas does Coastal Solar Power serve?
Coastal Solar Power serves Savannah, Hinesville, Pooler, Richmond Hill, Statesboro, Vidalia. They are based in Savannah with a service radius of 120 km.
What warranty does Coastal Solar Power offer?
Coastal Solar Power offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Coastal Solar Power's customer reviews?
Coastal Solar Power has a 4.5/5 rating based on 20 customer reviews. Customers consistently rate them highly.
How long has Coastal Solar Power been in business?
Coastal Solar Power was founded in 2011 and has been in business for 15 years. They are one of the more experienced solar installers in their area.
Similar Installers in Savannah
Get a Free Solar Quote from Coastal Solar Power
Fill in your details and we'll connect you with Coastal Solar Power.
Quote request sent!
Coastal Solar Power will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile