CS

Commonwealth Solar

Central Kentucky solar installer offering residential and commercial systems with A+ BBB rating and full-service capabilities

Lexington, Kentucky
5 (9 reviews)
Verified
Residential Commercial off-grid

6+

Years in Business

0

9

Customer Reviews

62 mi

Service Area

1-10

Employees

SurgePV Score

7.8 / 10
Customer Reviews
100%
Certifications
60%
Experience
70%
Services Range
75%
Warranty Coverage
80%
Online Presence
75%

About Commonwealth Solar

Commonwealth Solar LLC is a Kentucky-based solar installer headquartered at 496 High Bridge Rd, Wilmore, KY 40390, serving the Central Kentucky region including Lexington and surrounding communities. Founded in 2020 by Owner and CEO Daniel Wier, the company provides comprehensive solar solutions at competitive prices.

Commonwealth Solar offers all tier-1 solar products including residential and commercial equipment, ground mounts, roof mounts, flat roof non-penetration mounts, canopies, and energy storage with backup generation for long-term outages or off-grid locations. The company provides full-service capabilities from design and installation to long-term maintenance.

Commonwealth Solar holds an A+ BBB rating and a perfect 5.0-star rating with 9 reviews. The company is ranked 9th in Kentucky and 127th nationally in installer rankings. Customers consistently praise the company for going above and beyond on service quality and using high-quality materials.

Service Area

Commonwealth Solar serves the following areas within a 62-mile radius:

LexingtonWilmoreLancasterNicholasvilleBardstownGeorgetown

Are you Commonwealth Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

BBB A+

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

9 reviews

Verified Customer

20 July 2025
Verified Customer

Commonwealth Solar went above and beyond with customer service and used high quality materials. Daniel and his team were professional and thorough throughout the entire project.

Verified Customer

10 May 2025
Verified Customer

Excellent local solar installer. They designed a system that fits our energy needs perfectly. The installation was clean and completed on schedule. Strongly recommend.

Verified Customer

28 February 2025
Verified Customer

Quality work from a quality local company. Commonwealth Solar provided great communication throughout the project and the system has been performing flawlessly.

Frequently Asked Questions About Commonwealth Solar

What services does Commonwealth Solar offer?

Commonwealth Solar offers Solar Installation, Battery Storage, Maintenance.

Is Commonwealth Solar NABCEP certified?

Commonwealth Solar holds the following certifications: BBB A+. Contact them directly for the latest accreditation details.

What areas does Commonwealth Solar serve?

Commonwealth Solar serves Lexington, Wilmore, Lancaster, Nicholasville, Bardstown, Georgetown. They are based in Lexington with a service radius of 100 km.

What warranty does Commonwealth Solar offer?

Commonwealth Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Commonwealth Solar's customer reviews?

Commonwealth Solar has a 5/5 rating based on 9 customer reviews. Customers consistently rate them highly.

How long has Commonwealth Solar been in business?

Commonwealth Solar was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Commonwealth Solar

Fill in your details and we'll connect you with Commonwealth Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote