SE

Solar Energy Solutions

Kentucky's largest and most experienced solar installer since 2006 with nearly 3,000 active projects across the Midwest

Lexington, Kentucky
4.9 (22 reviews)
Verified
Residential Commercial Industrial

20+

Years in Business

3,000+

Projects Completed

22

Customer Reviews

124 mi

Service Area

51-200

Employees

SurgePV Score

9.4 / 10
Customer Reviews
98%
Certifications
90%
Experience
100%
Services Range
90%
Warranty Coverage
80%
Online Presence
100%

About Solar Energy Solutions

Solar Energy Solutions (SES) is the region’s largest and most experienced solar design, engineering, and construction company, headquartered at 1038 Brentwood Ct, Suite B, Lexington, KY 40511. Founded in 2006, SES is a local, family-owned solar panel installer with nearly 3,000 active photovoltaic and battery storage projects across the Midwest.

SES serves residential, commercial, agricultural, and utility-scale clients in Kentucky, Illinois, Indiana, Ohio, and surrounding states. The company employs numerous NABCEP-certified photovoltaic installers, licensed engineers, and electricians. SES is the region’s leading Tesla Powerwall Certified Installer and a SunPower Certified Dealer, working with equipment suppliers including Canadian Solar and Unirac.

Solar Energy Solutions also offers EV charging station installation and solar battery storage solutions. The company holds a 4.9-star rating from EcoWatch experts and participates in the Solarize Lexington program, helping make solar more affordable for local residents.

Service Area

Solar Energy Solutions serves the following areas within a 124-mile radius:

LexingtonLouisvilleFrankfortRichmondGeorgetownNicholasville

Are you Solar Energy Solutions?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance
Monitoring

Certifications & Accreditations

NABCEP Certified Tesla Powerwall Certified Installer SunPower Certified Dealer

Partner Manufacturers

Panels

Canadian SolarSunPower

Batteries

Tesla Powerwall 3

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

22 reviews

Verified Customer

5 September 2025
Verified Customer

Solar Energy Solutions designed and installed a system perfectly suited to our home. Their team of NABCEP-certified installers was thorough and professional from start to finish.

Verified Customer

20 June 2025
Verified Customer

Outstanding experience with SES. They handled everything from permitting to installation seamlessly. The Tesla Powerwall integration works flawlessly with our solar panels.

Verified Customer

8 April 2025
Verified Customer

SES is the real deal. Nearly 20 years of experience shows in the quality of their work. The engineering team designed an optimal system and the installation crew was top-notch.

Frequently Asked Questions About Solar Energy Solutions

What services does Solar Energy Solutions offer?

Solar Energy Solutions offers Solar Installation, Battery Storage, EV Charging, Maintenance, Monitoring.

Is Solar Energy Solutions NABCEP certified?

Solar Energy Solutions holds the following certifications: NABCEP Certified, Tesla Powerwall Certified Installer, SunPower Certified Dealer. Contact them directly for the latest accreditation details.

What areas does Solar Energy Solutions serve?

Solar Energy Solutions serves Lexington, Louisville, Frankfort, Richmond, Georgetown, Nicholasville. They are based in Lexington with a service radius of 200 km.

What warranty does Solar Energy Solutions offer?

Solar Energy Solutions offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Solar Energy Solutions's customer reviews?

Solar Energy Solutions has a 4.9/5 rating based on 22 customer reviews. Customers consistently rate them highly.

How long has Solar Energy Solutions been in business?

Solar Energy Solutions was founded in 2006 and has been in business for 20 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Solar Energy Solutions

Fill in your details and we'll connect you with Solar Energy Solutions.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote