Redemption Solar and Roofing
Veteran-owned Louisville solar and roofing company with BBB A+ rating
4+
Years in Business
21
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About Redemption Solar and Roofing
Redemption Solar and Roofing is a veteran-owned and locally operated solar and roofing company located at 1700 UPS Drive, Suite 208, Louisville, KY 40223. Founded in 2022, the company has quickly established itself as a trusted installer in the Louisville metropolitan area.
Redemption Solar and Roofing holds a BBB A+ rating and has been BBB accredited since September 2022. The company offers comprehensive roofing and solar services including residential and commercial solar installations, roof inspections, and energy storage solutions.
The company serves Louisville and surrounding communities including Shelbyville, La Grange, and Elizabethtown, providing integrated roofing and solar solutions that maximize system performance and roof integrity.
Service Area
Redemption Solar and Roofing serves the following areas within a 62-mile radius:
Contact Information
Are you Redemption Solar and Roofing?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
21 reviews
Verified Customer
Redemption Solar handled both our new roof and solar installation. Having one company manage both made the process seamless and saved us money.
Verified Customer
As a veteran-owned business, Redemption brings discipline and attention to detail to every project. Our solar panels are performing above estimates.
Verified Customer
Mike and the team at Redemption were fantastic from consultation to completion. Great communication, fair pricing, and quality workmanship throughout.
Frequently Asked Questions About Redemption Solar and Roofing
What services does Redemption Solar and Roofing offer?
Redemption Solar and Roofing offers Solar Installation, Battery Storage, Maintenance.
Is Redemption Solar and Roofing NABCEP certified?
Redemption Solar and Roofing holds the following certifications: BBB A+, Veteran-Owned Business. Contact them directly for the latest accreditation details.
What areas does Redemption Solar and Roofing serve?
Redemption Solar and Roofing serves Louisville, Shelbyville, La Grange, Elizabethtown, Frankfort. They are based in Louisville with a service radius of 100 km.
What warranty does Redemption Solar and Roofing offer?
Redemption Solar and Roofing offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Redemption Solar and Roofing's customer reviews?
Redemption Solar and Roofing has a 4.9/5 rating based on 21 customer reviews. Customers consistently rate them highly.
How long has Redemption Solar and Roofing been in business?
Redemption Solar and Roofing was founded in 2022 and has been in business for 4 years. They are a newer entrant in the solar installation market.
Similar Installers in Louisville
Get a Free Solar Quote from Redemption Solar and Roofing
Fill in your details and we'll connect you with Redemption Solar and Roofing.
Quote request sent!
Redemption Solar and Roofing will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile