Pure Power Solar
NABCEP-certified Louisville solar installer designing custom systems since 2017
9+
Years in Business
18
Customer Reviews
62 mi
Service Area
1-10
Employees
SurgePV Score
About Pure Power Solar
Pure Power Solar is a locally owned and operated solar installation company located at 11226 Bluegrass Parkway, Louisville, KY 40299. Founded in 2017 by Nick Hartnett, the company designs custom solar power systems for homes and businesses in the Greater Louisville area.
Pure Power Solar employs NABCEP-certified solar professionals and maintains a BBB A+ rating with accreditation since 2020. The company provides full-service solar installations from initial consultation and system design through permitting, installation, and ongoing support.
Pure Power Solar serves residential and commercial customers across Louisville and the surrounding Kentuckiana region, offering custom-designed solar energy systems tailored to individual energy needs and roof configurations.
Service Area
Pure Power Solar serves the following areas within a 62-mile radius:
Contact Information
Are you Pure Power Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
18 reviews
Verified Customer
Nick and the Pure Power Solar team designed a custom system that perfectly fits our home and energy needs. Professional from start to finish.
Verified Customer
Pure Power Solar is the best local solar company in Louisville. NABCEP certified, fair pricing, and they stand behind their work. Highly recommend.
Verified Customer
Excellent experience. Pure Power Solar handled everything from design to permitting to installation. The system has been generating exactly as promised.
Frequently Asked Questions About Pure Power Solar
What services does Pure Power Solar offer?
Pure Power Solar offers Solar Installation, Battery Storage, system_design.
Is Pure Power Solar NABCEP certified?
Pure Power Solar holds the following certifications: NABCEP Certified, BBB A+. Contact them directly for the latest accreditation details.
What areas does Pure Power Solar serve?
Pure Power Solar serves Louisville, Shelbyville, Frankfort, Elizabethtown, Southern Indiana. They are based in Louisville with a service radius of 100 km.
What warranty does Pure Power Solar offer?
Pure Power Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Pure Power Solar's customer reviews?
Pure Power Solar has a 4.9/5 rating based on 18 customer reviews. Customers consistently rate them highly.
How long has Pure Power Solar been in business?
Pure Power Solar was founded in 2017 and has been in business for 9 years. They have solid experience in the solar industry.
Similar Installers in Louisville
Get a Free Solar Quote from Pure Power Solar
Fill in your details and we'll connect you with Pure Power Solar.
Quote request sent!
Pure Power Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile