CS

Contact Solar

MCS and HIES certified solar installer since 2012 with over 1,100 Trustpilot reviews, serving Coventry and the Midlands

Coventry, UK
4.8 (1120 reviews)
Verified
Residential Commercial

14+

Years in Business

1,120

Customer Reviews

250 km

Service Area

11-50

Employees

SurgePV Score

8.5 / 10
Customer Reviews
96%
Certifications
90%
Experience
85%
Services Range
90%
Warranty Coverage
70%
Online Presence
50%

About Contact Solar

Contact Solar is a solar PV and battery storage installer headquartered at 10 Eaton Avenue, Buckshaw Village, Chorley, PR7 7ND. Established in 2012, the company has grown into one of the UK’s highest-rated solar installers, serving customers across England including Coventry and the wider West Midlands. Contact Solar holds MCS and HIES accreditations and is a Which? Trusted Trader.

The company specialises in residential and commercial solar panel installations with battery storage. Contact Solar provides a complete service including site survey, system design, installation, MCS certification, and Smart Export Guarantee registration. They are known for competitive pricing, with multiple customers reporting significantly lower quotes compared to other installers for equivalent specifications. The company offers flexible finance options to spread the cost of installation.

With over 1,120 reviews on Trustpilot and a 4.8-star rating, Contact Solar has one of the strongest customer satisfaction records in the UK solar industry. Customers consistently highlight the quality of communication throughout the process, the professionalism of installation engineers, and the value for money offered. The company also holds 5-star ratings on Google, reinforcing their reputation across multiple review platforms.

Service Area

Contact Solar serves the following areas within a 250 km radius:

CoventryBirminghamLeicesterNottinghamManchesterChorley

Are you Contact Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Monitoring
Maintenance

Certifications & Accreditations

MCS HIES Which? Trusted Trader

Warranty Coverage

Panel Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4.8

1120 reviews

Verified Customer

10 November 2025
Verified Customer

Contact Solar kept me updated at every stage and I felt I could easily speak to someone to deal with queries. Engineers arrived on time, were well dressed, polite and knowledgeable.

Verified Customer

25 September 2025
Verified Customer

Contact Solar's quote was over twelve thousand pounds lower than another supplier for the same solar and battery spec. Professional quotation and installation throughout.

Verified Customer

8 July 2025
Verified Customer

From start to finish the service was excellent. The installation team were professional, tidy, and completed the work to a very high standard.

Frequently Asked Questions About Contact Solar

What services does Contact Solar offer?

Contact Solar offers Solar Installation, Battery Storage, Monitoring, Maintenance.

Is Contact Solar MCS certified?

Yes, Contact Solar is MCS certified and also holds HIES, Which? Trusted Trader certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Contact Solar serve?

Contact Solar serves Coventry, Birmingham, Leicester, Nottingham, Manchester, Chorley. They are based in Coventry with a service radius of 250 km.

What warranty does Contact Solar offer?

Contact Solar offers 25-year panel warranty, and 10-year installation/workmanship warranty.

How are Contact Solar's customer reviews?

Contact Solar has a 4.8/5 rating based on 1120 customer reviews. Customers consistently rate them highly.

How long has Contact Solar been in business?

Contact Solar was founded in 2012 and has been in business for 14 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Contact Solar

Fill in your details and we'll connect you with Contact Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote