KC

KS Connexions

MCS-accredited renewable energy experts with over a decade of experience, serving Coventry and Warwickshire from Leamington Spa

Coventry, UK
4.9 (110 reviews)
Verified
Residential Commercial Industrial

9+

Years in Business

110

Customer Reviews

50 km

Service Area

11-50

Employees

SurgePV Score

8.2 / 10
Customer Reviews
98%
Certifications
75%
Experience
85%
Services Range
90%
Warranty Coverage
70%
Online Presence
50%

About KS Connexions

KS Connexions is a renewable energy and electrical contracting company headquartered at 29 Waterloo Place, Leamington Spa, CV32 5LA. With over a decade of experience in the design, supply, and installation of solar panel systems, the company serves residential, commercial, and industrial clients across Coventry, Warwickshire, and the wider West Midlands. KS Connexions holds MCS accreditation and NAPIT certification.

The company specialises in tailored solar PV system design, battery storage solutions, and smart EV charger installations for both domestic and commercial properties. Their approach starts with a detailed consultation to understand each client’s energy needs, followed by a bespoke system design that maximises generation and self-consumption. KS Connexions also offers flexible finance options through Kandoo to help spread the cost of installations.

With 110 reviews and a 4.9-star rating on Birdeye, KS Connexions is one of the highest-rated solar installers serving the Coventry area. Customers regularly praise the quality of workmanship, the tidiness of installations, and the performance of completed systems. The company is also listed on the Coventry City Council Green Business Directory as a recommended local renewable energy provider.

Service Area

KS Connexions serves the following areas within a 50 km radius:

CoventryLeamington SpaWarwickKenilworthStratford-upon-AvonRugby

Are you KS Connexions?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Monitoring

Certifications & Accreditations

MCS NAPIT

Warranty Coverage

Panel Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4.9

110 reviews

Verified Customer

12 October 2025
Verified Customer

KS Connexions did an exceptional Solar & Battery installation at my home. I found them to be diligent and polite workers, completing a wonderfully neat installation. The finished result was a masterpiece and the performance of the panels have far exceeded my expectations.

Verified Customer

30 July 2025
Verified Customer

From the brief to the initialisation of the installed system, Kevin, Stin, Nick and the team delivered a turnkey solution that was beyond our expectations. An altogether extremely impressive performance, with unbelievable value for money.

Verified Customer

15 April 2025
Verified Customer

Design is tailored to suit individual requirements and from design through installation to operation a thoroughly professional outfit. Our system has exceeded our expectations with good support post-installation.

Frequently Asked Questions About KS Connexions

What services does KS Connexions offer?

KS Connexions offers Solar Installation, Battery Storage, EV Charging, Monitoring.

Is KS Connexions MCS certified?

Yes, KS Connexions is MCS certified and also holds NAPIT certification. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does KS Connexions serve?

KS Connexions serves Coventry, Leamington Spa, Warwick, Kenilworth, Stratford-upon-Avon, Rugby. They are based in Coventry with a service radius of 50 km.

What warranty does KS Connexions offer?

KS Connexions offers 25-year panel warranty, and 10-year installation/workmanship warranty.

How are KS Connexions's customer reviews?

KS Connexions has a 4.9/5 rating based on 110 customer reviews. Customers consistently rate them highly.

How long has KS Connexions been in business?

KS Connexions was founded in 2017 and has been in business for 9 years. They have solid experience in the solar industry.

Get a Free Solar Quote from KS Connexions

Fill in your details and we'll connect you with KS Connexions.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote