GS

GreenCloud Solar

Family-run solar installer based in Coventry, specialising in residential solar PV and battery storage across the West Midlands

Coventry, UK
4.9 (20 reviews)
Verified
Residential

4+

Years in Business

20

Customer Reviews

40 km

Service Area

2-10

Employees

SurgePV Score

7.5 / 10
Customer Reviews
98%
Certifications
60%
Experience
70%
Services Range
90%
Warranty Coverage
60%
Online Presence
50%

About GreenCloud Solar

GreenCloud Solar is a family-run renewable energy company based at 16 Friars Close, Binley Woods, Coventry, CV3 2QW. Trading as Coventry Solar, the company focuses on supplying solar PV and battery storage systems to homeowners in Coventry and the surrounding areas. GreenCloud Solar is a member of the Renewable Energy Consumer Code (RECC) and the Approved Code Scheme regulated by Trading Standards.

The company provides end-to-end residential solar installations, from initial consultation and system design through to installation, commissioning, and aftercare. GreenCloud Solar installs monitoring systems that allow homeowners to track energy generation, consumption, and savings via a smartphone app. As a local Coventry business, they offer a personal service with direct access to the team throughout the project.

Customers rate GreenCloud Solar highly on Bark with a 5-star rating, and reviews highlight the speed of installation, the professionalism of the team, and the quality of post-installation support. Being a Coventry-based family business, the company has built its reputation on word-of-mouth recommendations from satisfied local customers. Their RECC membership provides additional consumer protection, including access to an independent dispute resolution service.

Service Area

GreenCloud Solar serves the following areas within a 40 km radius:

CoventryKenilworthWarwickNuneatonBedworthRugby

Are you GreenCloud Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Monitoring
Maintenance

Certifications & Accreditations

RECC

Warranty Coverage

Panel Warranty

25 years

Installation Warranty

5 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4.9

20 reviews

Verified Customer

5 October 2025
Verified Customer

I had a fantastic experience with GreenCloud Solar Ltd. From the initial consultation to the final installation, they were informative and accommodating. The installation itself was done with great professionalism, and they went above and beyond to meet my specific requirements.

Verified Customer

22 July 2025
Verified Customer

What impressed me the most was their speed. They installed the solar system much faster than other quotes I had received.

Verified Customer

10 May 2025
Verified Customer

I was really impressed by the solar system including battery fitted by GreenCloud Solar. The process was smooth and uncomplicated from the initial quote through to completion. The app allows me to see where energy is used and how I can make savings throughout the home.

Frequently Asked Questions About GreenCloud Solar

What services does GreenCloud Solar offer?

GreenCloud Solar offers Solar Installation, Battery Storage, Monitoring, Maintenance.

Is GreenCloud Solar MCS certified?

GreenCloud Solar holds the following certifications: RECC. Contact them directly for the latest accreditation details.

What areas does GreenCloud Solar serve?

GreenCloud Solar serves Coventry, Kenilworth, Warwick, Nuneaton, Bedworth, Rugby. They are based in Coventry with a service radius of 40 km.

What warranty does GreenCloud Solar offer?

GreenCloud Solar offers 25-year panel warranty, and 5-year installation/workmanship warranty.

How are GreenCloud Solar's customer reviews?

GreenCloud Solar has a 4.9/5 rating based on 20 customer reviews. Customers consistently rate them highly.

How long has GreenCloud Solar been in business?

GreenCloud Solar was founded in 2022 and has been in business for 4 years. They are a newer entrant in the solar installation market.

Get a Free Solar Quote from GreenCloud Solar

Fill in your details and we'll connect you with GreenCloud Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote