Elektra Smart Energy
MCS-accredited renewable energy specialists based in Warwickshire, serving Coventry with solar panels, battery storage and EV chargers
3+
Years in Business
30
Customer Reviews
60 km
Service Area
2-10
Employees
SurgePV Score
About Elektra Smart Energy
Elektra Smart Energy is a renewable energy company based at Unit 6, Avon House, Mulberry Street, Stratford-upon-Avon, CV37 6RS. Although incorporated in February 2023, the company draws on over 30 years of electrical engineering experience in the Warwickshire area through its founding team. Elektra holds MCS, NAPIT, and TrustMark accreditations and serves Coventry and the wider Midlands region.
The company provides solar panel installations, battery storage systems, EV chargers, and electric heating solutions for both residential and commercial properties. What sets Elektra apart is their engineering-led approach: initial consultations are conducted by qualified energy assessors and electrical engineers rather than sales staff. They visit properties in person to assess suitability before designing systems, rather than relying solely on aerial photography as some competitors do.
Elektra Smart Energy has earned positive reviews across Trustpilot, Google, and Checkatrade. Customers consistently highlight the technical competence of the team, the quality of design advice, the clarity of communication throughout projects, and the tidiness of completed installations. The company is also listed on Checkatrade with verified customer reviews and on Yell with a strong local presence in Warwickshire.
Service Area
Elektra Smart Energy serves the following areas within a 60 km radius:
Contact Information
Are you Elektra Smart Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Warranty Coverage
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.8
30 reviews
Verified Customer
The team did a wonderful job of designing, planning and installing our solar panels, battery and inverter system. The design was tailored to our needs and the constraints of the location and great advice was given at all stages.
Verified Customer
Excellent experience with a solar panel and home battery installation. The initial discussion was with qualified engineers, rather than a sales team, and system planning through to commissioning was first rate.
Verified Customer
I was very impressed with their professional approach throughout the process. Unlike some solar installers who work initially from aerial photography, an Elektra representative came to the house to assess suitability, measure up, and discuss the options.
Frequently Asked Questions About Elektra Smart Energy
What services does Elektra Smart Energy offer?
Elektra Smart Energy offers Solar Installation, Battery Storage, EV Charging, Energy Audit.
Is Elektra Smart Energy MCS certified?
Yes, Elektra Smart Energy is MCS certified and also holds NAPIT, TrustMark certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Elektra Smart Energy serve?
Elektra Smart Energy serves Coventry, Stratford-upon-Avon, Warwick, Leamington Spa, Solihull, Birmingham. They are based in Coventry with a service radius of 60 km.
What warranty does Elektra Smart Energy offer?
Elektra Smart Energy offers 25-year panel warranty, and 10-year installation/workmanship warranty.
How are Elektra Smart Energy's customer reviews?
Elektra Smart Energy has a 4.8/5 rating based on 30 customer reviews. Customers consistently rate them highly.
How long has Elektra Smart Energy been in business?
Elektra Smart Energy was founded in 2023 and has been in business for 3 years. They are a newer entrant in the solar installation market.
Similar Installers in Coventry
Get a Free Solar Quote from Elektra Smart Energy
Fill in your details and we'll connect you with Elektra Smart Energy.
Quote request sent!
Elektra Smart Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile