CS

Covenant Solar & Roofing

Full-service solar and roofing company with a dedicated Louisville office

Louisville, Kentucky
4.6 (14 reviews)
Verified
Residential Commercial

12+

Years in Business

0

14

Customer Reviews

62 mi

Service Area

11-50

Employees

SurgePV Score

7.6 / 10
Customer Reviews
92%
Certifications
60%
Experience
85%
Services Range
75%
Warranty Coverage
80%
Online Presence
50%

About Covenant Solar & Roofing

Covenant Solar & Roofing is a solar and roofing company with a Louisville office at 11106 Decimal Drive, Suite 500, Louisville, KY 40299. Founded in 2014, the company provides integrated solar and roofing services for residential and commercial properties.

Covenant Solar & Roofing is BBB accredited and offers comprehensive services including solar panel installation, roofing, and energy storage solutions. The company’s combined roofing and solar expertise ensures proper integration of solar systems with roof structures.

The Louisville office serves the greater Louisville metropolitan area including Crestwood, La Grange, Shelbyville, and surrounding communities. Covenant Solar also operates a general contact line at (877) 895-0272 for customer inquiries.

Service Area

Covenant Solar & Roofing serves the following areas within a 62-mile radius:

LouisvilleCrestwoodLa GrangeShelbyvilleJeffersontown

Are you Covenant Solar & Roofing?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.6

14 reviews

Verified Customer

18 September 2025
Verified Customer

Covenant Solar handled both our roof replacement and solar installation. Having one company manage both projects saved time and money.

Verified Customer

25 June 2025
Verified Customer

Professional installation by the Louisville team. The solar panels integrate well with our new roof and the system is performing as expected.

Verified Customer

8 March 2025
Verified Customer

Good overall experience with Covenant Solar. They were responsive and the installation was completed within the quoted timeline.

Frequently Asked Questions About Covenant Solar & Roofing

What services does Covenant Solar & Roofing offer?

Covenant Solar & Roofing offers Solar Installation, Battery Storage, Maintenance.

Is Covenant Solar & Roofing NABCEP certified?

Covenant Solar & Roofing holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Covenant Solar & Roofing serve?

Covenant Solar & Roofing serves Louisville, Crestwood, La Grange, Shelbyville, Jeffersontown. They are based in Louisville with a service radius of 100 km.

What warranty does Covenant Solar & Roofing offer?

Covenant Solar & Roofing offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Covenant Solar & Roofing's customer reviews?

Covenant Solar & Roofing has a 4.6/5 rating based on 14 customer reviews. Customers consistently rate them highly.

How long has Covenant Solar & Roofing been in business?

Covenant Solar & Roofing was founded in 2014 and has been in business for 12 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Covenant Solar & Roofing

Fill in your details and we'll connect you with Covenant Solar & Roofing.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote