Creative Solar USA
Georgia-based turn-key solar installer since 2008, with NABCEP-certified staff and residential, commercial, and government installations
18+
Years in Business
25
Customer Reviews
75 mi
Service Area
11-50
Employees
SurgePV Score
About Creative Solar USA
Creative Solar USA is a Georgia-based, turn-key solar installation company headquartered at 3380 Town Point Drive NW, Suite 130, in Kennesaw, Georgia. Founded in 2008 by Russell, the company serves residential, commercial, and government customers across the state. Creative Solar USA employs NABCEP-Certified PV Installation Professionals and Technical Sales Professionals alongside licensed Master Electricians. The company is a member of SEIA and the Georgia Solar Energy Association (GSEA) and holds a BBB accreditation.
The company handles every phase of the solar installation process, from initial consultation and system design through permitting, installation, and ongoing maintenance. Creative Solar USA installs panels assembled in Georgia, supporting local manufacturing. The company also provides battery storage solutions for homeowners seeking backup power and energy independence.
Creative Solar USA serves the greater Atlanta metro area from its Kennesaw headquarters, including Marietta, Roswell, Alpharetta, Woodstock, Canton, and Acworth. With nearly two decades of operation in the Georgia solar market, the company has built relationships with local utilities and permitting offices that help streamline the installation process. Business hours are Monday through Friday, 9 AM to 6 PM.
Service Area
Creative Solar USA serves the following areas within a 75-mile radius:
Contact Information
Are you Creative Solar USA?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
25 reviews
Phillip G.
Creative Solar USA has been in the Georgia market for over 15 years and it shows. The team was knowledgeable, the installation was clean, and the system is performing above our expectations.
Catherine N.
We appreciated that Creative Solar is locally owned and operated in Georgia. They understood the local permitting process and utility requirements. Installation was completed on time and on budget.
Derek F.
Solid company with experienced staff. The NABCEP-certified installer who led our project was thorough and explained everything clearly. System has been running well for three months.
Frequently Asked Questions About Creative Solar USA
What services does Creative Solar USA offer?
Creative Solar USA offers Solar Installation, Battery Storage, Solar Design, Roof Assessment, Energy Audit, Grid Connection, Maintenance.
Is Creative Solar USA NABCEP certified?
Creative Solar USA holds the following certifications: NABCEP Certified PV Installation Professional, NABCEP Certified Technical Sales Professional, SEIA Member, GSEA Member, BBB Accredited. Contact them directly for the latest accreditation details.
What areas does Creative Solar USA serve?
Creative Solar USA serves Atlanta, Kennesaw, Marietta, Roswell, Alpharetta, Woodstock, Canton, Acworth. They are based in Atlanta with a service radius of 120 km.
What warranty does Creative Solar USA offer?
Creative Solar USA offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Creative Solar USA's customer reviews?
Creative Solar USA has a 4.5/5 rating based on 25 customer reviews. Customers consistently rate them highly.
How long has Creative Solar USA been in business?
Creative Solar USA was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.
Similar Installers in Atlanta
Get a Free Solar Quote from Creative Solar USA
Fill in your details and we'll connect you with Creative Solar USA.
Quote request sent!
Creative Solar USA will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile